All content in this website is sourced legitimately

REPORTS

Total number of reports : 16064

  • Jul 29:Solar and wind power: Not everyone has the going smooth Details
  • Jul 29:JSW Renew Energy Limited: Balance PPA signed with SECI Details
  • Jul 29:Ganco Energy (India) Private Limited: Non cooperating with rating agency Details
  • Jul 29:Tulip Renewable Powertech Private Limited: Moderate financial performance Details
  • Jul 29:Methodology for Coal Mining: Know more Details
  • Jul 29:Maharashtra Transmission Communication Infrastructure Limited seeks withdrawal of ratings Details
  • Jul 29:India’s first Green Hydrogen Fuelling Station: Tender floated by owner Details
  • Jul 29:CESC: Higher O&M expense tempers its profits Details
  • Jul 29:Coal Off-take goes up during Q4 2020-21 Details
  • Jul 28:Term Ahead Contracts and Green Term Ahead Contracts beyond T+11 days: Cannot be allowed Details
  • Jul 28:India plans to commission more nuclear power plants in future Details
  • Jul 28:Projections for power demand in India: Irrational exuberance? Details
  • Jul 28:GE Power: Order increased Details
  • Jul 28:Business opportunity: More Captive power plant coming up Details
  • Jul 28:Rolex Rings Limited: Investment in Renewable energy to reduce cost of power Details
  • Jul 28:Efficiency based system better than merit order mechanism: About 50 GB of capacity can become redundant Details
  • Jul 28:TEEC: Expected to do better despite depressed industry conditions Details
  • Jul 28:Energy storage can provide majority of reserves by 2030: If allowed to do so Details
  • Jul 28:Industrial Energy Ltd: Tolling model does well Details
  • Jul 27:Auction of coal mines for sale of coal: An update Details
  • Jul 27:How Much Energy Storage Is Cost-Effective in the Long Term? Details
  • Jul 27:67 MW captive power plants: Opportunity coming up Details
  • Jul 27:CIL: Measures Adopted To Reduce Pollution during Coal Transportation Details
  • Jul 27:National Smart Grid Mission: 7.23 lakh smart meters have been sanctioned Details
  • Jul 26:3x250 MW Thermal Power station: Bids for DSI-FGD system Package Details
  • Jul 26:Odisha Generation Phase-II Transmission Limited seems withdrawal of ratings Details
  • Jul 26:Annual Fixed Charges allowed for 765/400 kV transmission asset Details
  • Jul 26:Indian Energy Exchange: Successfully started cross border electricity trade in its DAM market Details
  • Jul 26:India Grid Trust: Stable performance of power transmission assets Details
  • Jul 24:As power demand reached record high, grid shows signs of serious instability Details