All content in this website is sourced legitimately

REPORTS

Total number of reports : 15363

  • May 16:Rs.227 crore conductor deal attracts aggressive participation, lowest bidder to watch Details
  • May 16:High-stakes ACSR conductor Tender: Six bidders compete for 5000+ km transmission deal in Indian power sector Details
  • May 16:Thermal, hydro, pumped storage, solar, wind, BESS and T&D activities of the day Details
  • May 15:A 25-year O&M clause with a tighter EPC timeline: What does it signal? Details
  • May 15:Discounting formula adjusted to reward bundled service offerings for Rs 560 crore transformer bid Details
  • May 15:One substation, multiple voltages: Tender allows dual-range deployment Details
  • May 15:No GIS this time for substations: AIS continues to dominate even in sensitive zones Details
  • May 15:RESCO model with no subsidy still draws a crowd Details
  • May 15:Bidder rush signals resurgent interest in decentralized solar Details
  • May 15:Steel majors vs. legacy fabricators in power-sector fabrication bid Details
  • May 15:Hydropower clearance battle: Seasoned environmental firm vs agile newcomer Details
  • May 15:Civil mega-package tender for Nuclear project draws unusually high contractor interest Details
  • May 15:Outsider wins: Mid-sized player topples legacy firm in latest award Details
  • May 15:Cost gap widens in new dust suppression EPC bid Details
  • May 15:Pre-qualified providers only: What it means for new electrolyser entrants in India Details
  • May 15:Thermal, hydro, pumped storage, solar, wind, BESS and T&D activities of the day Details
  • May 15:Daily forward looking import matrices Details
  • May 14:Design scope expands in latest ash management consultancy brief Details
  • May 14:Liquid ammonia handling fully upstream: Key downstream risk eliminated Details
  • May 14:Steep slopes, sharper scrutiny: New dump design norms surface Details
  • May 14:No phase-wise installation: tender demands plug-and-play readiness Details
  • May 14:Life extension or phased rebuild? 210 MW hydro project scope suggests more than a retrofit Details
  • May 14:Nine Fixes In, Still No Go: Lower Arun Hydro Tender Stalls Amid Design Turbulence Details
  • May 14:Fly ash handling scope shifts from fixed tenure to operational flexibility Details
  • May 14:Fly ash handling scope shifts from fixed tenure to operational flexibility Details
  • May 14:No independent engineer mandated in draft contract: direct monitoring model emerges Details
  • May 14:Unusual staging of tunneling sequence points to cost load spreading strategy Details
  • May 14:Hydropower tunnel execution reveals cost-spreading strategy via unusual Adit-to-HRT staging Details
  • May 14:Oracle stack still powers BHEL’s core IT: Legacy forms and reports remain crucial amid India's evolving power sector Details
  • May 14:Daily forward looking import matrices Details