All content in this website is sourced legitimately

REPORTS

Total number of reports : 15210

  • Aug 05: Rs. 3170+ crore order placed for 30×80MVAR reactor fleet Details
  • Aug 05: Siemens clinches ultra-high voltage reactor order in Rs. 3,161 crore package Details
  • Aug 05: Over 80 firms eye rural grid-solar contracts in Rajasthan Details
  • Aug 05: High bidder interest hints at aggressive pricing ahead in Rajasthan solar auction Details
  • Aug 05: Narrowest spread in recent LT transformer awards raises competition bar Details
  • Aug 05: Advisory contract opens strategic gateway into India’s coal and mineral auctions Details
  • Aug 05: Consultancy tender floats for long-haul coal delivery system Details
  • Aug 05: Scope widens from powerhouse to rooftop solar base in thermal plant civil tender Details
  • Aug 05: Rajasthan’s first 1GWh+ grid storage bid stretches deadline amid pre-bid revisions Details
  • Aug 05: Cooling tower EPC for 2×660 MW project sees strict design window and dual-unit staging Details
  • Aug 05: Multi-location turnkey scope spans 220KV, 110KV and distribution upgrades Details
  • Aug 05: Tariff race opens for decentralized solar push in Rajasthan Details
  • Aug 05: Tight bid calendar sees three successive deadline extensions Details
  • Aug 05: Ninth extension issued for 1600 MW thermal switchyard EPC Details
  • Aug 05: Roorkee GIS package sees fifth extension amid bid hesitation Details
  • Aug 05: Bid date pushed third time as Roorkee grid LILO sees high bidder interest Details
  • Aug 04: Thermal, hydro, pumped storage, solar, wind, BESS and T&D contract related activities of the day Details
  • Aug 04:Daily forward looking import matrices Details
  • Aug 04: Himalayan hydro tunneling bid sees fourth deadline shift amid design-access disconnect Details
  • Aug 04: Rs.431 million winning quote stuns rivals in 765 KV transmission auction Details
  • Aug 04: NR-WR corridor stress triggers new 765 kV Prayagraj substation build-out Details
  • Aug 04: Switching upgrade: ICT and reactor controls contract bagged for Rs.14.5 crore Details
  • Aug 04: Single bidder secures Rs.46.9 crore grid upgrade package for 500 MW RE linkage Details
  • Aug 04: Power utility shifts to centralized PT specs for 66 KV NER substation revamp Details
  • Aug 04: Buyback model returns: Full-cycle battery disposal now contractor’s risk Details
  • Aug 04: 400/220 KV transformer upgrade signals selective grid strengthening under RTM push Details
  • Aug 04:Switchyard tender for 2400 MW plant sees fifth extension amid civil cost and cashflow tweaks Details
  • Aug 01: Thermal, hydro, pumped storage, solar, wind, BESS and T&D contract related activities of the day Details
  • Aug 01: Multi-substation EPC tender for 110/11KV and 110/33KV package sees extension window Details
  • Aug 01:Strategic corridor for RE-powered ammonia gets infrastructure spine Details