All content in this website is sourced legitimately

REPORTS

Total number of reports : 15123

  • May 09:Amara Raja to set up a 16 GWh Lithium Cell manufacturing unit Details
  • May 09:Power generator to appoint a consultant (Mining) Details
  • May 09:Websol Energy to obtain loan from IREDA Details
  • May 09:SJVN: Project awarded Details
  • May 09:2375 MW Khavda Renewable project: EPC contractor appointed Details
  • May 09:Talabira coal mines: Action soon Details
  • May 09:Hydro generator gets trading licence Details
  • May 09:State Transmission Utility disappointed Details
  • May 09:Regulator rejects ReNew request Details
  • May 09:KPTCL fails to maintain time drift: Is L&T responsible? Details
  • May 09:Only one Indian bank supports Net Zero target? Details
  • May 09:Lignite Input Price fixed Details
  • May 03:Tirunelveli Vayu Energy Generation Pvt Ltd: Why has withdrawn Details
  • May 03:ACME Chittorgarh Solar Energy Pvt Ltd: Get updated ratings Details
  • May 03:Power Ministry to appoint consultant Details
  • May 03:Get latest capex plan for captive power plants Details
  • May 03:New procedure for billing and energy accounting under Virtual Net Metering Framework Details
  • May 03:No new connection without meter: The Licensee shall install meters with demand recording facility Details
  • May 03:Haryana to procure power from pool of the Central Generating Stations (CGS) Details
  • May 03:TP Saurya Ltd v/s Gujarat Urja Vikas Nigam Ltd: TP Saurya disappointed Details
  • May 03:Regulator refuses Brihanmumbai Electric Supply and Transport Undertaking (BEST) request Details
  • May 03:NTPC: Director (Fuel) appointed Details
  • May 03:Sharmila Chavaly appointed as a director Details
  • May 03:Genus Power reconstitutes its board committee Details
  • May 03:DMR Hydroengineering & Infrastructures to invest in an EPC firm Details
  • May 03:EKI Energy Services Ltd: Get updated ratings Details
  • May 03:Suzlon Energy gets an independent director Details
  • May 03:Carbon capture and storage (CCS) in India: How long will it take before CO2 gets injected? Details
  • May 03:Biomass co-fired coal power plants: Applicability extended Details
  • May 03:Consumer Grievance Redressal Forum (CGRF): Amendment done Details