All content in this website is sourced legitimately

Archives


All the news items since the launch of our web site are preserved in the archive section. The archive entries are freely accessible to all the users.


Oct 2025

 For reference purposes the website carries here the following tenders:
 
8Tender for work of overhauling of turbine generator including attending oil seal leakage Details
 
8Tender for estimate for bifercation of 11 kV feeder Details
 
8Tender for empanelment of agencies for restoration of distribution infrastructure Details
 
8Tender for survey, installation, testing and commissioning of 11 kV different capacity addl. PTRs,11 kV line Details
 
8Tender for installation, testing and commissioning of new 5 MVA 33/11kV substation Details
 
8Tender for survey, installation, testing and commissioning of 33 kV different capacity addl. PTRs, 33 kV line Details
 
8Tender for supply of PCC poles Details
 
8Tender for work contract for comprehensive maintenance contract (CMC) of two year for continuous ambient air quality monitoring station Details
 
8Tender for procurement of various fire hose pipes Details
 
8Tender for repair and maintenance of balance rollers Details
 
8Tender for annual maintenance contract for routine maintenance of Nitrogen injection fire protection system Details
 
8Tender for supply of 7.5 KW slip ring induction motor Details
 
8Tender for supply of LT cable Details
 
8Tender for annual maintenance contract for complete servicing / overhauling / attending fault / repairing / checking of various Details
 
8Tender for supply, erection, testing & commissioning of 66 kV S/C line Details
 
8Tender for works contract for day to day preventive and breakdown maintenance including emergency breakdowns at night in 400kV, 230kV and 110kV lines Details
 
8Tender for supply of ECO hopper spill over ash disposal tray for middle path of Unit III ECO hoppers Details
 
8Tender for procurement and erection of ID fan casing top portion Impeller wear plate Details
 
8Tender for supply of 2500 nos rain coat with hood and pouch Details
 
8Tender for running contract for carrying out the O and M works, improvement works Details
 
8Design, manufacture, inspection, testing, packing and supply of 6.6kV, 1700kW weatherproof squirrel cage Details
 
8Tender for supply of material and erection for replacement of old RCC poles to RSJ poles and related clamps, bus bars connectors etc Details
 
8Tender for supply of material and erection for replacement of old RCC poles Details
 
8Tender for dismantling fabrication supply and erection of portion of flue gas ducts Details
 
8Tender for procurement of ACSR PANTHER conductor Details
 
8Tender for supply of 11kV 120KN disc insulators Details
 
8Tender for procurement of 119 sets of batteries of various capacities Details
 
8Tender for supply of 33kV outdoor vacuum circuit breakers Details
 
8Tender for dismantling fabrication supply and erection of portion of flue gas ducts Details
 
8Tender for supply of oil injected air cooled screw type single stage 110KW rotary air compressor with related accessories Details
 
8Tender for AMC for work of overhauling, servicing, repair and maintenance of 245kV circuit breakers at various Details
 
8Tender for supply, installation, testing and commissioning (SITC) of new in tank D-type OLTC (on load tap changer) Details
 
8Tender for work of various safety related and other miscellaneous fabrication / repairing of C.W. pump Details
 
8Tender for external special coating works in condenser water box, CW system, ACW system, service water tanks & pipe line structure Details
 
8Tender for work of instrumentation maintenance Details
 
8Tender for miscellaneous civil maintenance work Details
 
8Tender for work of erection of 66kV transformer bay Details
 
8Tender for construction of concrete protection wall for rectification of water logging /submerged tower problem Details
 
8Tender for construction of underground bunker Details
 
8Tender for deployment of JCB excavator for assisting in unloading of biomass pellets Details
 
8Tender for supply of spares of gear box of raw coal feeder Details
  
8Tender for biennial contract for round the clock operation, routine, preventive mechanical maintenance and housekeeping, cleaning works, breakdown mechanical maintenance of complete FGD and SCR Details
  
8Tender for selection of MDO for 2nd phase basalt mine Details
  
8Tender for procurement of shaft end seal Details
  
8Tender for supply & commissioning of new power cylinder for coal mill Details
  
8Tender for work of ash lifting of ESP all 04 pass for boiler Details
  
8Tender for work of overhauling /break down of the 165KW/33 dewatering pump, 90KW storm water pump Details
  
8Tender for insulation, refractory and removal of fly ash, debris from pressure part, ducts Details
  
8Tender for routine preventive breakdown maintenance of RC feeder associated work Details
  
8Tender for procurement of spares for electrical actuators installed Details
  
8Tender for routine, periodical and breakdown maintenance contract works Details
  
8Tender for supply of SS316 hot water tank for condensate polishing regeneration Details
  
8Tender for routine, periodical and breakdown maintenance contract works Details
  
8Tender for preventive, breakdown and general works in respect of electrical maintenance Details
  
8Tender for supply of ordinary stay clamp for 8M PSC pole Details
  
8Tender for supply of oil injected air cooled screw type single stage 110KW rotary air compressor Details
  
8Tender for work of live control /power cable dressing, appropriate clamping, strengthening and cleaning of cables Details
  
8Tender for repair of damaged plaster of outer wall Details
 
8Tender for construction of breast wall Details
  
8Tender for providing and application of anti corrosion polysulphide modified epoxy resin on MIV, penstock Details
  
8Tender for effective waste disposal management service through schedule waste collection Details
  
8Tender for supply of 400kV and 220kV current transformers Details
  
8Tender for annual rate contract of work of various routine, break down, preventive and shutdown maintenance works of existing lignite handling plant Details
  
8Tender for supply of sample cooler for sampling system for boiler Details
  
8Tender for supply, erection & commissioning of H2 leak detection system Details
  
8Tender for supply & installation of marshalling box with accessories for station service transformers Details
  
8Tender for work of complete overhauling of ring granulators Details
  
8Tender for replacement of age old asbestos roofing with advanced weatherproof roofing Details
  
8Tender for dismantling of 110kV bays columns beams and transformers Details
  
8Tender for yard remetalling Details
  
8Tender for construction of lift room Details
  
8Tender for supply of GI helically formed GUY grip (HT) for distribution system Details
  
8Tender for supply of 18 sets of 220kV SF6 circuit breakers and one set of gas filling kit Details
  
8Tender for erection of new RMU after laying 500 m UG cable Details
  
8Tender for procurement of M/s super search metal detector(SMD) complete with panel installed Details
  
8Tender for procurement of spares of hydraulic power pack Details
  
8Tender for loading transporation and filling of ash Details
  
8Tender for BMC of fire alarm panel & procurement of required spares Details
  
8Tender for work of annual contract for attending emergency fault & annual maintenance work of 220/132/110kV EHV lines Details
  
8Tender for supply, supervision of installation ,testing and commissioning of VRLA batterieson buy back Details
  
8Tender for roof treatment with felt over power house Details
  
8Tender for supply of spares of transfomers Details
  
8Tender for supply of spares of 400kV and 220kV circuit breaker Details
  
8Tender for supply of spares for high performance energy chain system Details
  
8Tender for work of transportation of 280MT, 500MW,588MVA, 21kV generator stator along Details
  
8Tender for supply of spares for furnace bottom ash disposal system Details
  
8Tender for overhauling work of mills Details
  
8Tender for repair and maintenance of control room at GSS  Details
 
8Tender for procurement of consumable and non-consumable materials for 132/33kV grid sub-station Details
  
8Tender for manufacture, fabrication, supply, erection, testing and commissioning of new 33/11kV AIS SS with 1X8 MVA power transformers, station transformer, associated equipments, accessories Details
  
8Tender for manufacture, fabrication, supply, erection, testing and commissioning of new 33/11kV AIS SS Details
  
8Tender for manufacture, fabrication, supply, erection, testing and commissioning of new 33/11kV AIS SS with 1X8 MVA power transformers Details
  
8Tender for procurement of motor spares Details
  
8Tender for strengthening of hill slope by concrete cladding on left bank Details
  
8Tender for segregation of 11 kV feeder Details
  
8Tender for replacement of ACSR weasel bare conductor by insulated covered conductor Details
  
8Tender for work of S.I.T.C. of MCCB panel on 25, 63, 100 KVA DTRs in various Details
  
8Tender for supply and installation of digital protection couplers Details
  
8Tender for supply of 3.5C LT PVC cable Details
  
8Tender for supply of XLPE insulated LT aerial bunched (AB) cable Details
 
You can also click on Tenders for more
 For reference purposes the website carries here the following newsclips:
 
8Govt constructing 10,000 km greenfield expressway projects at Rs 6 lakh crore investment: Gadkari Details
  
8Renewables globally overtake coal: Can India lead the green energy transition Details
  
8CIP Appoints POWERCON to Manage 300 MW Wind Energy Project in Karnataka Details
  
8Rainfall led to dip in CIL's coal output in September Reddy Details
  
8Coal Cargo Terminal Opens In Brundamal Details
  
8Avaada to invest Rs 36,000 crore in solar, wind and BESS projects in Gujarat Details
  
8Women hold 32% of full-time jobs in the renewable energy sector, IRENA report finds Details
  
8Shell to revive Sprng Energy sale in India Details
  
8India’s Solar Capacity Hits 125 GW; Renewables Now Power Over Half the Grid Details
  
8NTPC Gujarat join hands to explore opportunities in energy sector Details
  
8Environmental public hearing of 1000 MW Naying hydro project to be held in November Details
  
8MSEDCL and GEAPP sign agreement to deploy AI and storage for grid optimisation Details
  
8Sarangi On Solar PV Assets Details
  
8Saatvik Green Energy Expands from Solar Manufacturing to Integrated Ecosystem Solutions with Launch of UDAY Series Inverters Details
  
8Bondada Engineering commissions 78.3 MW solar projects across India Details
  
8Power Finance Corporation Divests Subsidiary to Power Grid Corporation for 7.29 Crore Details
  
8Storage is becoming the way forward in India Details
  
8At India-UK CEO Forum, Modi announces to open country’s nuclear power sector to private players Details
  
8Punjab power sector unions to launch protest against plan to sell department assets Details
  
8Insolation Energy Expands Solar Footprint with New Subsidiary SPV Details
  
8HPL Electric & Power Secures Expanded Smart Meter Order Worth INR 92 Crores Details
  
8Sembcorp to acquire ReNew’s 300MW solar unit for US$246 million Details
  
8As Punjab govt eyes auction of vacant lands, power sector unions set to launch protest Details
  
8Restructured Accelerated Power Development and Reforms Programme Details
 
You can also click on Newsclips for more Details
1) Western region maintains strong power position with 27.3% all-India share
8The Western region's significant share in India's power landscape underscores its pivotal role in national energy security and regional economic growth.
 
2) Prepaid metering proposal violates RDSS guidelines
 
8UERC questioned UPCL’s move to extend prepaid metering to all consumers up to 25 kW load.

8The deviation from RDSS norms could alter consumer recovery mechanisms, prompting a call for modification.
 
3) Regulation 28 invoked for second-tier redressal
8The appellant invoked the appellate mechanism under the HPERC (CGRF & Ombudsman) Regulations, 2013.
8This clause enables industrial consumers to escalate grievances beyond the forum stage.
 
4) APR for FY 2023–24 highlights operational challenges
8The utility presented mid-term adjustments reflecting rising energy demand and transmission constraints.
8HPERC will assess whether performance targets were met under the approved control period.
 
5) Verdict reinforces consumer protection in disaster-linked billing disputes
8The case sets a key precedent for industrial consumers facing force majeure billing during calamities.
8It strengthens procedural accountability and equitable redress in Himachal’s power sector.
 
6) HPSEBL ordered to refund proportionate demand charges with interest
8The Ombudsman directed HPSEBL to return or adjust demand charges for the 18-day shutdown period.
8Interest up to 15% was mandated under the 2018 Supply Code and 2022 amendments.
 
Click on Details for more

Details
1) Market coupling seen as opportunity, not disruption, by HPX
8With the introduction of market coupling in the Day Ahead Market, HPX is poised to leverage its tech edge to compete effectively and expand its presence in key segments.
 
2) Regulatory amendment aligns Andhra Pradesh with national consumer rights standards
8The Sixth Amendment to the Licensees’ Standards of Performance Regulation emphasizes timely meter replacements, aligning state regulations with national consumer protection rules.
 
3) IREDA sets new benchmark with ?1,699 Cr. PAT for FY 2024-25
8IREDA's record-breaking profit underscores its dominance in green financing, setting a high bar for financial transparency by publishing results within 15 days.
 
4) First-time bidders welcomed in Andhra Pradesh's new energy procurement policy
8APERC opens doors for first-time bidders, potentially diversifying the competitive landscape.
8This inclusivity could lead to innovative approaches and disrupt established market dynamics.
 
5) Northern Region coal stock remains stable; no critical shortages reported
8For the first half of September 2025, coal stocks in Northern Region thermal plants are stable, alleviating concerns of potential shortages that could impact power generation.
 
6) Energy firms on alert as APTEL shifts court hearing dates unexpectedly
8The unexpected shift in APTEL's Court-II hearing dates puts energy firms on alert, prompting them to reassess their timelines for dispute resolutions and regulatory compliance.
 
Click on Details for more
Details
8Find a snapshot of thermal, hydro, pumped storage,
solar, wind, BESS and T&D contracts related updates for the day
Click on Reports for more Details
Gujarat’s 2000MW BESS project: Hybrid finance architecture bridges grant and tariff
8The VGF structure combines capital grant disbursal with long -term capacity -charge revenue This hybrid design mirrors solar precedents but adds auditor certification and CEA validation for each tranche. Details
REC’s 400kV sub -station: No relaxation in Make -in -India or border rules
8The amendment modifies only dates not procurement origin clauses OEMs must still meet domestic value -add norms under the 2024 Ministry of Power order.

Tuticorin Green Hydrogen transmission: Record -length bidding process tests REC’s credibility
8Crossing the 20 -extension mark is unprecedented Stakeholders warn that such over -extension could signal insufficient pre -bid groundwork and weaken policy discipline. Details
8The Rs.431million bid leaves little headroom for O&M errors Future rounds may demand sharper cost tracking and revised contingency assumptions to maintain viability. Details
400kV Roorkee LILO project: Technical reply tightens cross -bonding rules
8Cross -bonding intervals capped at 400m enhance system reliability but raise civil workload OEM testing before dispatch now mandatory Vendors must recalibrate resource planning accordingly.

765/400kV intra -state project: PFC tightens bidder eligibility
8The revised Annexure demands declarations on ownership and country of origin Developers must confirm non -association with restricted entities Bars of Rs.1420crore technical experience and Rs.568crore net worth still apply. Details
CHP O&M contract: Three -year fixed -price term tests contractor resilience
8With no escalation clause and heavy manpower dependence the long -term O&M contract will test bidders’ ability to sustain profitability under static pricing.

DVC Konar tender sets precedent for hybrid FSPV -BESS evacuation designs
8By merging floating solar and storage into a single 132kV node DVC signals its strategic shift to integrated RE corridors The Konar model could inform future hydro and thermal hybrids across the valley. Details
Delay exposes mismatch between RDSS targets and vendor readiness
8The RDSS distribution upgrade assumed steady transformer supplies Instead testing and procurement delays have slowed circle -level rollouts Utilities may turn to multi -source framework agreements to recover time.

Jalna substation tie -up could pioneer state transco -EPC alliances nationwide
8If effective similar models could emerge in Maharashtra and Gujarat for future renewable corridors The success metric will be MSETCL’s bid win rate and execution quality This experiment merges public mandate with private discipline Details
8HCC L&T Patel Engineering and Rithwik Projects have entered the technical bid stage All bring dam credentials from Tehri Subansiri and Punatsangchhu works Competition remains elite but limited. Details
8Only Kalpataru KEC and L&T submitted bids across all lots The absence of regional players signals high entry barriers and qualification ceilings Price competition is therefore expected to narrow within a tight band. Details
1) DAM sell depth swamped demand; RTM stayed tighter
8On 2025-10-09, DAM sell bids were ~3.36× purchase bids (719,604.25 vs 214,155.82 MWh); RTM’s sell/purchase ratio was lower at ~2.27× (440,701.38 vs 193,977.93 MWh).
Inference — Participants deferred some coverage to intraday where sell overhang was smaller, even though DAM showed ample supply.
Why it matters — Bid-cover asymmetry shifts price risk into RTM; portfolios leaning on RTM face slippage if sell depth thins.

2) HPX clipped the RTM price cap on thin flow
8On 2025-10-09, HPX RTM cleared just 150 MWh while printing MCP at Rs 10.00/kWh (Rs 10,000/MWh); the same day IEX RTM’s weighted MCP was ~Rs 3.07/kWh.
Inference — Venue liquidity bifurcation: scarce volumes at HPX can still set punitive prints even as IEX remains moderate.
Why it matters — Cross-venue execution policies need Rs/kWh guardrails; small HPX fills can distort delivered cost.

3) GDAM leaned non-solar in the stack while staying below DAM’s top end
8On 2025-10-09, GDAM MCV split was ~2,000 MW solar vs ~1,076 MW non-solar; weighted MCP printed ~Rs 3.18/kWh, below DAM’s daily high (Rs 3.30/kWh).
Inference — Non-solar green supply (biomass/small hydro) shouldered a larger share of green clears, keeping GDAM prices disciplined against DAM peaks.
Why it matters — Merchant RE sellers can time non-solar bids to stabilise revenue; buyers get a mid-Rs 3 handle for certified green blocks.

4) Hydro-peaking auctions went dry despite heavy sell interest
8Across 03-10 to 09-10, HPDAM showed sizeable daily sell bids (~1.20–1.25 lakh MWh) but zero final scheduled volume on every day.
Inference — Buyers did not value (or could not schedule) hydro “shape” this week; peaking flexibility remained monetarily unrecognised.
Why it matters — If HPDAM stays illiquid, hydro fleets may pivot to RTM or ancillary, altering scarcity rents elsewhere.

5) Northern grid leaned on hydro while thermal under-delivered (2025-10-08)
8In NR, hydro actual was ~272.19 MU vs programme 189.51 MU (+~43%); thermal actual was ~653.53 MU vs 899.52 MU (-~27%).
Inference — Hydro backfilled a thermal shortfall, shifting marginal price formation to water availability on the day.
Why it matters — With this mix swing, weekly MCPs can hinge on reservoir posture; hydro scheduling will drive Rs outcomes.

6) All-India fuel switch: hydro over-performed as coal lagged (2025-10-08)
8All-India thermal actual was ~3,269.47 MU vs programme 4,130.86 MU (-~21%); hydro actual was ~650.91 MU vs 455.44 MU (+~43%).
Inference — National dispatch leaned on water; coal under-realisation likely reflected outages/maintenance or economic backing-down.
Why it matters — Sustained hydro substitution compresses peak DAM prints but raises exposure to hydrology risk later in the season.

7) Rajasthan shows inventory-to-utilisation mismatch
8On 2025-10-08, Chhabra-I (PH-2) held ~176% of normative stock at ~73% PLF, while Suratgarh TPS sat at ~85% of normative stock at ~24% PLF.
Inference — Coal placement isn’t tracking near-term burn at all stations; logistics may be favouring already-comfortable plants.
Why it matters — Mis-targeted stock ties up working capital and risks demurrage; rebalancing saves Rs without affecting reliability.

8) Northern reservoirs entered October stronger than last year
8Bhakra’s present level was ~509.04 m vs ~501.09 m on the same day last year; Pong was ~421.88 m vs ~414.91 m (2025-10-08).
Inference — Healthier storage provides cushion for continued hydro backfill if thermal under-performs.
Why it matters — Extra headroom supports price stability during shoulder peaks; prudent for SLDCs to schedule hydro flex to cap Rs spikes.
Click on Details for more
Details
1) Solar power project tariff reinstatement underscores regulatory diligence importance
8The Himachal Pradesh Commission's decision to restore the original tariff for a delayed solar project emphasizes the need for meticulous regulatory oversight in energy sector agreements.
2) Himachal Pradesh Commission’s decision affirms Rs. 3.75/kWh tariff for solar project
8In a significant ruling, the Himachal Pradesh Electricity Regulatory Commission confirms the Rs. 3.75 per kWh tariff for Guru Kripa Solar, showcasing the role of regulatory oversight in tariff disputes.
3) Tariff decision signals regulatory vigilance in Himachal Pradesh
8The Commission’s decision to uphold the Rs. 3.75 tariff showcases its commitment to regulatory oversight and fair market practices.
4) TP DISCOMs face regulatory heat as OERC addresses service gaps
8The rescheduled hearing could lead to significant directives aimed at improving consumer service, affecting TP DISCOMs' operational framework in Odisha.
Click on Details for more
Details
1) HPERC ruling highlights significance of adhering to tariff order timelines
8The recent ruling favoring Rudransh Solar emphasizes the critical role of stipulated timelines in tariff orders, spotlighting potential pitfalls when project delays intersect with regulatory mandates.
2) Kamaksha Solar wins tariff battle, Rs. 3.75/kWh reinstated
8The Commission's decision to uphold the original tariff rate for Kamaksha Solar underscores its commitment to rectify procedural errors.
3) Himachal solar tariff corrected: implications for future PPA filings
8The order highlights the necessity for accurate PPA filings and adherence to tariff orders, with potential implications for future project agreements and filings.
4) Tariff dispute resolved: Himachal project to benefit from Rs. 3.65/kWh rate despite delay
8A review petition reveals oversight in tariff stipulations, resulting in a favorable outcome for the Maa Naina Power Project.
8The case emphasizes the need for careful contract terms to safeguard financial interests.
5) HPERC clarifies tariff confusion; Rs. 3.65/kWh reinstated for solar project
8The commission’s latest decision highlights the importance of PPA timelines and regulatory clarity in tariff determinations.
Click on Details for more
Details
1) Regulatory shift: New clauses emphasize renewable integration in transmission projects
8Emerging regulatory clauses require bidders to incorporate renewable energy considerations in transmission infrastructure, reflecting India's strategic pivot towards sustainable energy solutions.
8Stakeholders must adapt to these evolving compliance requirements.
2) Delayed solar project wins tariff appeal, sets precedent for others
8Krishna Solar's successful appeal for a higher tariff despite a delay underscores the importance of adhering to regulatory provisions and sets a precedent for future renewable energy projects.
3) Delayed solar project in Himachal gets reprieve with restored tariff
8A ruling favoring M/s Shiv Kripa Solar Power ensures adherence to the original Rs. 3.75 tariff despite commissioning delays.
8This marks a significant precedent for handling tariff orders.
4) Delayed solar project in Himachal Pradesh retains higher tariff through review
8Jai Mata Solar's successful tariff review illustrates the strategic importance of understanding regulatory timelines and their financial implications in the solar sector.
5) Himachal review highlights key tariff order misinterpretation
8The Commission's review corrected a tariff misapplication for a solar project, highlighting the critical need for accurate interpretation of tariff orders and control period stipulations.
6) Delay doesn't reduce tariff: Solar project wins Rs. 3.65/kWh rate in review
8A solar project in Himachal Pradesh secured the original tariff rate after proving its eligibility under existing regulatory orders, despite commissioning delays.
Click on Details for more
Details
1) Interest on excess billing: JSERC clamps down on JBVNL's non-compliance
8With non-compliance deemed a regulatory violation, JSERC's order puts JBVNL under pressure to fulfill its financial obligations to Ramkrishna Forgings, setting a precedent for future cases.
2) APTEL overturns JSERC's 2% ARR penalty on JBVNL, demands fresh assessment
8The Appellate Tribunal for Electricity rules JSERC exceeded its authority with ARR penalties, mandating a reassessment under established regulatory frameworks.
3) ACME Greentech advances in inter-state electricity trading with Commission nod
8The Commission's preliminary approval of ACME’s license marks a pivotal step in diversifying India's electricity market, emphasizing regulatory openness to new entrants.
4) EPC contractors face new challenges with solar tender stipulations
8The tender introduces stipulations that pose challenges for EPC contractors, affecting project timelines and costs.
8Navigating these complexities will be critical for successful project delivery.
5) New player Energyminds targets national electricity trading arena
8With a Category-V licence application, Energyminds Power Solutions plans to expand its footprint across India.
8The entry of new players may alter power trading pricing strategies.
6) Raghanesda transmission project: A blueprint for large-scale renewable integration
8The project's extensive scope and timeline provide a model for future renewable energy infrastructure developments across India.
Click on Details for more
Details
1) Tariff differential case at HERC highlights financial stakes in power contracts
8As Star Wire's petition against HPPC continues, the case underscores the significant financial implications of tariff adjustments in power purchase agreements.
2) Industrial bodies push for tariff modifications amid HERC review
8Yamunanagar and Laghu Udyog Bharati's petition for tariff changes underscores significant industrial pushback, potentially influencing future regulatory approaches.
3) Government extends green hydrogen proposal deadline to enhance innovation
8By prolonging the submission period for green hydrogen projects, the government seeks to encourage more startups to enter the fray, promising a surge in innovative energy solutions.
4) GST changes challenge financial stability of Uttarakhand solar projects
8A new GST ruling imposing 18% tax on property rentals under RCM could significantly shift the financial landscape for solar projects, raising cost concerns.
5) Northern power entities face stringent payment deadlines amidst regulatory shifts
8As regulatory frameworks tighten, power entities must adhere to strict payment deadlines or risk surcharges, underscoring the growing financial pressures in the sector.
6) Captive power gains grid access: Rungta Mines leads the way
8Strategic surplus power supply to JBVNL marks a critical step in optimizing Jharkhand's power grid and industrial energy distribution.
Click on Details for more
Details
It is easy to get month-old import data but it is difficult to solicit forthcoming shipment information in India. We go through a laborious process of data collection to get you full import information, including company-wise, quantity-wise, port-wise, vessel-wise cargoes which are coming into India in the next 15-to30 days.
Get the daily updates for :
8LNG
8Crude
8Chemicals
8Fertilizers
8Coal and Coke
8LPG
8Ammonia

Click on Reports for more. Details
1) Central sector misses transformation capacity target by 62% in H1 FY 2025-26
8The central sector reported a significant gap in achieving its transformation capacity targets, with only 23,320 MVA completed against a target of 62,005 MVA.
8This shortfall could delay crucial energy projects nationwide.
2) PGCIL set to add 4.5 GW capacity with new sub-stations in Rajasthan and Gujarat
8Power Grid Corporation of India Limited (PGCIL) is enhancing its transmission capacity with major installations in key renewable energy zones.
8This move is critical for accommodating the surge in renewable energy projects.
3) Adani takes charge with 4,500 MW ISTS projects in private sector
 
8Adani Group's significant ISTS projects highlight private sector dynamism in transforming India's power landscape, crucial for renewable integration in the Khavda region.
4) Rs. 0.04% daily surcharge looms over late reactive energy payments, warns NRPC
8The Northern Regional Power Committee enforces strict penalties for delayed payments, emphasizing the need for timely financial compliance by utilities.
5) APTEL ruling accelerates tariff policy reform in Andhra Pradesh's power sector
8APERC's compliance action, driven by APTEL's judgment, initiates a crucial transition to more equitable electricity tariffs, potentially reshaping financial dynamics for DISCOMs and large consumers.
6) CEA's findings on transformer failures: A wake-up call for utilities
8The CEA's in-depth analysis of transformer failures serves as a critical wake-up call for utilities to revamp their operational and maintenance strategies.
Click on Details for more Details
1) Inter-regional capacity hits 1,20,340 MW, aiming for greater grid stability
8With an increase to 1,20,340 MW, inter-regional capacity underscores India's focus on grid stability and energy security.
8This expansion is instrumental in facilitating power flow across regions.
2) State sector struggles with only 24% of targeted transmission lines completed
8State-level utilities have completed merely 1,676 ckm against a target of 6,780 ckm, raising concerns about resource allocation and project management across India.
3) Strategic implications of increased intra-state transmission activities
8The surge in intra-state transmission projects signifies a strategic shift towards decentralized power distribution, with implications for regulatory policies and infrastructure planning.
4) HPPTCL strengthens Himachal Pradesh's hydro power evacuation
8Himachal Pradesh's hydro power evacuation gets a boost with HPPTCL's new transmission lines connecting Kutehr HEP.
8These projects are crucial for maximizing the state's hydroelectric potential and enhancing grid stability.
5) Solar developers shielded from new Himachal Pradesh royalty charges
8While developers are unaffected, a new regulatory ruling allows royalty costs to be passed onto consumers, stirring industry discussion.
6) Private sector transformation capacity contribution hits 85,172 MVA
8The private sector's transformation capacity contribution reached 85,172 MVA, showcasing a significant rise in private investments.
8This shift is vital for understanding the evolving dynamics of India's power infrastructure market.
Click on Details for more
Details
8Find a snapshot of thermal, hydro, pumped storage,
solar, wind, BESS and T&D contracts related updates for the day
Click on Reports for more Details
8The winning tariff of Rs.446.99million per annum sets a new floor for substation augmentation costs. The PSU’s low financing cost out competed private bidders. Margins compress further in upcoming TBCB rounds. Details
8Multiple extensions expanded participation and ensured fairer discovery. Final clearance of nine qualified bidders marks robust competition. The extended window may become standard for high volume logistics bids. Details
NTPC’s 400kV GIS switchyard bid: Vendor field likely restricted to four to five heavyweights
8Only firms with recent 400kV GIS execution in India can qualify. This narrows tariff competition but ensures technical reliability. Bid spread is expected to be tight within single digit margins.

Durgapur EPC model may set digital precedent for state utilities
8The integration of eBG hybrid meetings and dynamic specifications is a first for DVC. If executed smoothly similar models may extend to future flue gas desulphurisation and renovation modernisation tenders. The package thus becomes a template for digital thermal procurement in India. Details
800MW Ukai TPS: Open tender structure fails to lure new entrants
8Despite an open format limited mid tier EPC appetite points to qualification or liquidity barriers. Without broader outreach BHEL may face single digit participation.

Efficiency class unchanged despite RDSS targets
8While MNRE encourages Level3 efficiency TANGEDCO sticks to Level2 for cost control. This choice cuts upfront expense but reduces long term loss savings. The decision underscores fiscal caution amid transformer steel inflation. Details
Mine-plan outsourcing signals compliance-first era
8The Barsingsar contract confirms NLC’s pivot to regulatory consultancy for mine governance. Expect similar review based contracts across its lignite portfolio.

Exclusivity clause binds EPC partner to Power Grid’s tariff bid
8Clause 3.0 forces pre selected bidders to sign an MOU pledging exclusive association with POWERGRID. The EPC cannot simultaneously bid under any other consortium for the same TBCB project. The MOU’s confidentiality and exclusivity terms effectively integrate the EPC into POWERGRID’s tariff strategy.The MAAT requirement of Rs 326 crore and liquidity bar of Rs 54.33 crore sharply narrow the bidder pool. Details
Distribution transformers tender: New-entrant policy reshapes vendor landscape
8First time bidders with approved plants can bag the entire order if L1. It opens the market to new manufacturers but tests TANGEDCO’s quality oversight. Industry response is mixed.

DPR package: Drone and LiDAR mapping made mandatory
8JUSNL now requires comprehensive UAV and LiDAR mapping for all proposed 400/220/132kV corridors. DPR preparation becomes a high tech exercise combining topographical accuracy with GIS analytics. This raises entry barriers but enhances alignment precision and planning speed. Details
Sankhari–Norta transmission line: Uniform Integrity Pact mandate extends to short links
8Even a 4km line now needs Integrity Pact submission. Small contractors must bear the same declaration burden as 765kV bidders. This enhances auditability but may discourage micro bidders.

Compressed window signals IREDA’s shift to agile legal procurement
8IREDA’s 72hour bid window replaces the month long tender cycles of its earlier legal RFPs. The speed test will show whether GeM can handle specialised consultancy without quality loss. The outcome may set the benchmark for future professional service procurements. Details
1) DAM sell overhang quadrupled on 2025-10-07
8Sell bids were ~4.00× purchase bids in DAM (713,481.63 vs 178,181.48 MWh).
Inference — Supply-side confidence outweighed demand appetite even as MCP averaged ~Rs 2.55/kWh.
Why it matters — A persistent bid-cover >3× suppresses price elasticity; generators risk chronic under-clearance if offer bands don’t adapt.

2) RTM demand eclipsed DAM bids on the same day
8On 2025-10-07, RTM purchase bids were 211,566.58 MWh vs DAM 178,181.48 MWh (~+19%).
Inference — Buyers shifted intent intraday, preferring flexibility over day-ahead coverage.
Why it matters — Portfolios leaning on RTM need tighter intra-day forecasts to avoid Rs/kWh slippage when sell depth thins.

3) PXIL RTM flickered back to life—tiny, but pricey
8On 2025-10-08, PXIL RTM cleared 25.00 MWh at Rs 10,000/MWh (Rs 10.00/kWh).
Inference — Micro-liquidity windows persist outside IEX; a single block can set punitive reference prints.
Why it matters — Even token volumes can distort settlement optics; traders should cap exposure to illiquid venues at pre-set Rs/kWh guards.

4) Frequency was tight, but the early-morning spike stood out
8All-India average was 49.998 Hz (FDI = 19.4); max 50.193 Hz at 07:58:10; min 49.827 Hz at 00:34:10 on 2025-10-08.
Inference — Morning ramp control needed high “mileage” despite a good mean—ancillary budgets should reflect this tail work.
Why it matters — Hidden balancing effort costs money; ignoring tails under-provisions Rs for regulation.

5) Solar carried the mid-afternoon system; VRE crossed 40 GW
8On 2025-10-07 (solar hours), solar contribution was 35,989 MW; variable RE (solar+wind) hit 40,954 MW at 15:48.
Inference — Mid-afternoon demand was cushioned by VRE, reducing thermal ramp pressure.
Why it matters — Merchant-exposed thermal fleets must re-optimize start/stop economics around this VRE bulge to protect Rs spreads.

6) 765 kV buses stayed within band—yet ran at the high end
8Jharsuguda 765 kV recorded max 791.20 kV, avg 782.52 kV with 100% in-band time on 2025-10-07.
Inference — Tap/VAR posture kept discipline but nudged voltages toward the upper edge through the day.
Why it matters — High-end operation raises reactive margins but can squeeze contingencies; operators should watch late-evening swings.

7) Northern hydro vastly out-performed plan while thermal lagged
8On 2025-10-07 (NR), hydro actual was 286.79 MU vs program 189.51 MU (~+51%); thermal actual 623.96 MU vs 899.52 MU (~-31%).
Inference — Hydro backfilled thermal shortfall, shifting marginal price formation to water availability.
Why it matters — With such fuel-mix swings, weekly MCPs can hinge on reservoir operations; hydro bid strategy drives Rs outcomes.

8) Delhi leaned on imports for ~98% of energy on 2025-10-08
8Self-generation was ~2.20 MU vs actual drawal 87.35 MU; total demand 89.55 MU.
Inference — The capital’s supply stack is dominantly external; RTM/DAM shocks can pass through quickly.
Why it matters — SLDC must budget for venue liquidity risk; a thin RTM hour can lift delivered costs in Rs/kWh.
Click on Details for more
Details
 For reference purposes the website carries here the following tenders:
 
8Tender for supply of agro residue base biomass pallets Details
 
8Tender for supply, fabrication, erection, testing and commissioning of additional 1 x 8 MVA power transformer Details
 
8Tender for construction of control room with allied civil works Details
 
8Tender for running contract for carrying out the extension improvement and maintenance work Details
 
8Tender for construction of control room with allied civil works Details
 
8Tender for works contract for conversion of LT OH to UG cable Details
 
8Tender for extension works carried out for effecting new LT of street light Details
 
8Tender for rate contract for replacement, shifting & overhauling of LT motors Details
 
8Tender for work order for repair of major distorted bend coils Details
 
8Tender for work contract for various C&I related job works required during Details
 
8Tender for supply of various carpentry work material for day to day maintenance work Details
 
8Tender for supply of IBR approved high pressure gate valve for pallet system Details
 
8Tender for services for lift operators Details
 
8Tender for providing, fixing & replacing of damaged drainage pipeline Details
 
8Tender for biennial rate contract for work of maintenance of coal handling plant Details
 
8Tender for empanelment of agencies for new 33/11kV substation Details
 
8Tender for procurement of collecting electrodes Details
 
8Tender for work of replacement of existing 0.2 ACSR conductor alongwith Details
 
8Tender for erection of pillar boxes , cable laying Details
  
8Tender for supply of rubber gloves 10inch length Details
  
8Tender for supply of spares of drip seal shield assembly Details
  
8Tender for procurement of collecting electrodes for ESP Details
 
8Tender for fixing of paver block Details
  
8Tender for work of overhauling of 132/33kV,50 MVA power transformer Details
  
8Tender for work of patrolling work and tightening of jumper of 220kV D/C transmission line Details
  
8Tender for work of replacement of SRI by new SRI for 220kV line Details
  
8Tender for maintenance of 400 kV D/C line Details
  
8Tender for work of anticorrosive for the various structures, auxiliaries, tanks Details
  
8Tender for work contract for preventive & breakdown maintenance work of vertical fire water and emulsifier water pumps Details
  
8Tender for providing and fixing galvalume sheet Details
  
8Tender for painting of boiler supporting structure and other allied structure Details
  
8Tender for renovation and maintenance works including Details
  
8Tender for supply of of scaffolding material Details
  
8Tender for rate contract for supply of spares of centrifugal pumps Details
  
8Tender for rate contract for pipe type earthing Details
  
8Tender for supply of universal standard energy meter Details
  
8Tender for replacement of defective CLR insulators with new CLR insulators Details
 
8Tender for restoration of damaged ESP fields, by dismantling of existing internals (if any) and erection, testing and commissioning with new materials  Details
  
8Design, supply, manufacturing, installation and commissioning of 40-meter radio tower Details
  
8Tender for replacement of cement sheet on roof Details
  
8Tender for rate contract for supply of load shackle. Details
  
8Tender for fabrication and supply of the ducts, duct supports and enclosure support structures Details
  
8Tender for rate contract for supply of bush and guide bush Details
  
8Tender for supply, installation, commissioning and 3-years CAMC for U#3 FSH boiler tube Details
  
8Tender for annual maintenance contract for civil works Details
  
8Tender for segregation of 11 kV mixed feeders Details
  
8Tender for R&M of cable Details
  
8Tender for extension of battery room Details
  
8Tender for annual contract for deputation of service engineer for inspection servicing main pumps and booster pumps Details
  
8Tender for supply of spare parts Details
  
8Tender for capacity enhancement and 110kV bus extension at 110kV substation Details
  
8Tender for reconductoring with LT ABC Details
  
8Tender for pole shifting along Details
  
8Tender for leasing of spares dark fibre of optical ground wire Details
  
8Tender for supply of Led floodlights, LDBs, wires and other accessories Details
  
8Tender for construction of retaining wall alongside Details
  
8Tender for fixing of rate contract for unforeseen restoration of civil works Details
  
8Tender for construction of electric supply Details
  
8Design manufacture testing before dispatch delivery of 8,378 nos. of three phase 440 Volt 50 Hz Low tension shunt capacitors Details
  
8Design, manufacture, testing and supply of 25/31.5MVA, 66/11KV ONAN/ONAF power transformers Details
  
8Tender for manufacture, testing, supply and delivery of 08 nos. 20MVA, 132/11kV ONAN power transformers Details
  
8Tender for procurement of light diesel oil LDO Details
  
8Tender for procurement of industrial grade large wide screen Details
  
8Tender for procurement of 170KM of ACSR wolf conductor Details
  
8Tender for estimate for 10 km line augoment on feeder Details
  
8Tender for transportation, installation, dismantling, etc. of ERS for different 400kV, 220kV and 132kV EHV line Details
  
8Tender for procurement of scale inhibitor, organo phosphonate HEDP based formulation for cooling water treatment system Details
  
8Tender for sale of 6 LAC MT dry fly ash Details
  
8Tender for supply and installation of V fans and GI is ducting system Details
  
8Tender for supply of various sizes of tubes and bends Details
  
8Tender for procurement of 200NB carbon steel seamless pipes and bends Details
  
8Tender for supply, erection, testing and commissioning of 16 MVA 33/11 kV power transformers Details
  
8Tender for procurement of main turbine journal bearing Details
  
8Tender for supply, erection, testing and commissioning of 8 MVA 33/11 kV power transformers Details
  
8Tender for enhancement of power transformer Details
  
8Tender for construction of control room with electrification septic tank and other related civil works Details
  
8Tender for procurement of insulating gate and jaw crusher plate assembly including linear actuator Details
  
8Tender for supply of SS316L & carbon steel pipes and fittings Details
  
8Tender for work of overhauling, servicing and repairing of penstock gate Details
  
8Tender for supply & transportation of spares of 33kV HT & 415 volt LT panel Details
  
8Tender for supply of spares (SS flexible hoses & check valves) for gas distribution system Details
  
8Tender for replacement of rusted towers/rusted member of tower Details
  
8Tender for supply of diverter switch and OLTC accessories of converter transformer Details
  
8Tender for civil work of external plaster Details
  
8Tender for work of replacement of 132kV, 50/1A metering CT by 132kV, 100/1A metering CT Details
  
8Tender for annual maintenance contract (AMC) for attending emergency, break down and maintenance work in respect of 132kV and 220 kV EHV lines Details
  
8Tender for work for providing & fixing of sheet moulding compound trench cover chequered plate Details
  
8Tender for BMC towards urgent repair/fault finding of various equipment Details
  
8Tender for work of maintenance of CO2 flooding system, refilling of CO2 gas hydrostatic pressure testing of cylinders Details
 
You can also click on Tenders for more
 For reference purposes the website carries here the following newsclips:

 
8Govt floats draft Coal Mines Employees Provident Fund Bill for discussion Details
  
8CIL & Ircon to Develop Rail Infrastructure Details
  
8India's increasing coal production faces evacuation hurdle as several key coal-rail links stand delayed Details
  
8IRCON International inks MoU with Coal India to develop rail infrastructure Details
  
8Coal India's Rs 390 Call Option Sees 4,351 Contracts Traded, Turnover Hits Rs 367.70 Lakhs Details
  
8Gallantt Ispat Ventures into Solar Power with New Subsidiary Details
  
8India reaches 490 MWh energy storage capacity by June 2025 Details
  
8UP hits 800 MW rooftop solar capacity, eyes 1,000 MW goal Details
  
8No new non-fossil energy target till 2030: Government Details
  
8Crompton secures Rs 52 crore solar rooftop contract in Telangana Details
  
8Waaree Renewable Technologies and Indosolar Set to Announce Q2 FY26 Results on October 10 Details
  
8Saatvik Green Energy expands portfolio with solar pumps, inverters amid steady sector growth Details
  
8Power stock hits 5% upper circuit after receiving order from Ajmer Vidyut Vitran Nigam Ltd Details
 
8Hedging Power Prices: India set to launch the electricity derivatives market Details
  
8No power cuts in Punjab from next summer: Arvind Kejriwal's big promise Details
  
8India now 3rd largest solar energy producer in world, says Pralhad Joshi Details
  
8Rise of a New Fuel: Green Hydrogen's Role in Mobility, Industry, and Power Generation Details
  
8Zodiac Energy Expands Green Footprint with 10.4 MW Solar Plant in Gujarat Details
  
8ECIL and DVC Sign MoU to Strengthen Security Infrastructure and Digital Solutions in Power Sector Details
  
8India Achieves Record Solar & Wind Generation in Early 2025 Details
  
8Private sector did not expect opening up of space, nuclear power sectors: Jitendra Singh Details
  
8India Achieves Record Solar and Wind Power Generation in First Half of 2025 Details
  
8Renewable energy exceeds global coal power generation for the first time ever, analysis finds Details
  
8Renewables edge out coal as world’s biggest source of electricity: Many positives, some concerns Details
 
You can also click on Newsclips for more Details
 For reference purposes the website carries here the following tenders:
 
8Tender for estimate for conductor aug. of 33 kV feeder Details
 
8Tender for estimate for conductor aug. of 33 kV line Details
 
8Tender for estimate for 01 No. new 33/11 kV S/s Details
 
8Tender for estt. for 33 kV line Details
 
8Tender for installation of additional 200 MVA 220/132 kV transformer Details
 
8Tender for procurement of high vacuum transformer oil filter machine Details
 
8Tender for works for effecting services in various schemes Details
 
8Tender for supply of shaft for PA fan type NDV 22 tiefstack for boiler Details
 
8Tender for job work of scanning/ inspection work of economizer and LTSH coils Details
 
8Tender for work of old rubber lining & providing of new rubber lining in various sizes tanks, pipes etc. Details
  
8Tender for bi-ennial rate contract (BRC) of complete boiler Details
  
8Tender for providing and applying interior & exterior emulsion painting work to station Details
  
8Tender for construction of RCC wall at stacker reclaimer Details
  
8Tender for work of overhauling, repairing, to carry out actual load test & certification of 125/20 ton EOT crane Details
  
8Tender for works of complete overhauling of HP and IP stop/control valves of 146 MW steam turbine Details
  
8Tender for work for routine, preventive & breakdown maintenance of HT/LT MCC panels Details
  
8Tender for preventive maintenance and emergency breakdown works in EHT lines Details
  
8Tender for supply of 132kV CT, 132kV PT, 132kV LA, 33kV VCB, 33kV CT, 33kV LA for sub-stations Details
  
8Tender for construction of new 11kV line and DTR SS alongwith dismantling and reconductoring of 11kV line Details
  
8Tender for preventive maintenance and emergency breakdown works in EHT lines Details
  
8Tender for supply and erection of materials for erection of new 11kV dedicated feeder Details
  
8Tender for rate contract for erection, maintenance and dismantling of electrical networks Details
  
8Tender for construction of underground power house Details
  
8Tender for construction of feeder tunnel Details
  
8Tender for operation of 33/11 kV sub station Details
  
8Tender for construction of barrage, intake and its appurtenant works including river diversion works, hydro mechanical works and associated project Details
  
8Tender for operation of 33/11 kV sub station Details
  
8Tender for work of replacement of existing 0.2 panther ACSR conductor Details
  
8Tender for augmentation of power transformer Details
 
8Tender for construction of 110kV substation Details
  
8Tender for augmentation by addition of 1x25MVA,132/33kV T/F Details
  
8Tender for construction of electric supply Details
  
8Tender for shifting 33/11kV substation Details
  
8Tender for supply installation and commissioning of sulphuric acid dosing system Details
  
8Tender for procurement of rotor temperature indicator set for power houses Details
  
8Tender for work of arresting water leakages Details
  
8Tender for work of erection of new bottom ash slurry line Details
  
8Tender for rate contract for routine, preventive & breakdown maintenance of TPS lighting system, fans, LT modules etc. Details
 
8Tender for E.P.C contract for design, engineering, manufacturing, testing, supply, installation and commissioning of liquid ring vacuum pumps Details
  
8Tender for extension, rerouting and laying of construction water supply system and other misc. works Details
  
8Tender for re- strengthening of existing 33kV feeder Details
  
8Tender for supply of common meter reading Details
  
8Tender for construction of R walls in yard of 33/22 kV substation Details
  
8Design, fabrication, fixing and erection, testing and commissioning of LT ACB panels for 400KVA 11/0.4KV and 630KVA 11/0.4kV disribution transformers Details
  
8Tender for development by providing protection work Details
  
8Tender for electrification work Details
 
8Tender for procurement of MS pipe Details
  
8Tender for procurement of stay wire 7/12 SWG -15000 Kgs Details
  
8Tender for work contract for painting of pipe rack/trussell structure Details
  
8Tender for work of replacement of rusted 37 (29+8) towers Details
  
8Tender for rain water harvesting system Details
  
8Tender for providing & fixing RCC precast pillars,barbed and chain link fencing Details
  
8Tender for rain water harvesting system Details
  
8Tender for servicing and overhauling of OLTC of different on 220/132 kV and 132/33 kV and 220/33 kV transformers Details
  
8Tender for construction of substation Details
  
8Tender for carrying out work of balanced painting of boiler Details
  
8Tender for rewinding/repair of HT motor of coal mill Details
  
8Tender for biennial civil maintenance and DI/CI/GI transmission and distribution water pipe line maintenance work Details
  
8Tender for supply, installation, testing & commissioning of microprocessor based MFM at various Details
  
8Tender for work of replacement of existing 0.2 panther ACSR conductor Details
  
8Tender for turbine maintenance division attending steam leaks in various pipelines Details
  
8Tender for repair work to the ESP Details
  
8Tender for providing A frame and other support plinths for failure replacement of 200 MVA interconnecting transformer Details
  
8Tender for miscellaneous civil works at 33/11 kV substation Details
  
8Tender for special maintenance and repair related civil works Details
  
8Tender for construction of special repair work Details
  
8Tender for AMC of PCs and peripherals Details
  
8Tender for maintenance work of HT/LT/TC line Details
  
8Tender for construction of new 132/33kV foundation, cable trench Details
  
8Tender for supply of 90/10 cupronickel condenser tubes Details
  
8Tender for supply of sweep frequency response analyzers Details
  
8Tender for supply, installation, testing & commissioning including required civil work Details
  
8Tender for supply, installation, testing & commissioning of conversion of 66kV line Details
  
8Tender for supply and application of metal protective compound for various pipe lines Details
  
8Tender for supply of cooling fan for cooling system of power transformers Details
  
8Tender for repair, maintenance, and installation of plant/ systems Details
  
8Tender for renovation and extension of control room Details
  
8Tender for supply of proportional valve for turbine governing system Details
  
8Tender for upgradation of 66kV substation Details
  
8Tender for on site testing and health diagnosis of laid 11kV HT cable Details
  
8Tender for augmentation work of 220/ 132 kV 200 /100 MVA power transformer Details
  
8Tender for procurement of spares for telescopic spout installed Details
  
8Tender for procurement of spares of silica, sodium and chloride analysers Details
  
8Tender for procurement of spares for various pumps Details
  
8Tender for supply of advance water cum foam Details
  
8Tender for supply transportation and insurance of circuit breaker analyzer Details
  
8Tender for servicing & overhauling of 245 kV CB Details
  
8Tender for procurement of 33kV CBs (circuit breakers) Details
 
You can also click on Tenders for more
 
For reference purposes the website carries here the following newsclips:
 
8Indian solar manufacturer to expand AI-powered production capacity in Gujarat Details
  
8RVUNL Concludes 1 GW/2 GWh BESS Auction With Record-Low Tariff of Rs1.775 Details
  
8Indosolar shares hit 5% upper circuit today; Epitome Trading and Investments offloads 2.55 lakh shares Details
  
860% increase in India’s carbon emissions by 2050, coal to remain top energy source: BP Energy Outlook Details
  
8Refex Renewables & Infra Secures 280 Million Rupee Project Details
  
8Saatvik Green Energy Secures Major Solar Module Orders Worth 7.08 Billion Rupees Details
  
8Global renewable energy production surpasses coal for the first time Details
  
8Govt pitches for sector-specific CSR framework for coal companies Details
  
8India generated record solar, wind power in first half of 2025: Report Details
  
8KSEB to waive rooftop solar fees under PMSG scheme Details
  
8Parag Parikh Appointed as CEO of GPSR Arya and Group CFO of GPS Renewables Details
  
8India to become second-largest renewable market as global growth doubles: IEA Details
  
8Juniper Green Energy signs 70MW PPA with Tata Power Details
  
8Govt likely to extend PM-KUSUM deadline again as targets lag behind Details
  
8Arunachal to form joint venture companies for seven mega hydropower projects Details
  
8India Energy Stack looks to overhaul power sector's technology backbone Details
  
8Why Jaiprakash Power Share Price is Rising Details
  
8Discoms in Indian States Sign Long-term Coal Deals Amid Rising Electricity Demand, Decarbonisation at Risk Details
  
8Solar, wind meet global power demand growth, fossil fuel use falls for first time: Report Details
  
8States sign more coal deals to meet projected power demand surge Details
  
8Nepal earns Rs 9.37 billion from electricity export to India and Bangladesh Details
  
8Renewables become biggest source of electricity globally for 1st time, beating coal Details
  
8Waaree Energies Expands with Kotsons Acquisition Details
  
8Empowering India: Tata Power-DDL's Collaborative Leap in Energy Sector Training Details
 
You can also click on Newsclips for more Details
1) DAM–RTM gap blew out pre-dawn in select blocks
8RTM cleared far below DAM around 04:00 IST on 2025-10-07; the 04:00–04:15 block printed ~Rs 10.68/kWh in RTM vs ~Rs 27.01/kWh in DAM.
Inference — Real-time sell pressure outpaced day-ahead conditions as unexpected flexibility showed up; ancillary readiness (SRAS+TRAS) also looked ample through predawn hours.
Why it matters — Utilities buying RTM in these windows saved ~Rs 16.33/kWh against DAM; portfolios should budget predawn RTM as a cost anchor.

2) Hydro-peaking auction ran sell-only; no buyers all day
8On 2025-10-07, HPDAM showed zero purchase bids across multiple 15-minute blocks while sell bids were posted.
Inference — Buyers likely met ramping needs via DAM/RTM and regulation rather than bespoke hydro-peaking blocks; ancillary and RTM depth undercut HPDAM uptake.
Why it matters — Hydro flexibility went un-monetised in HPDAM; PSP owners should reassess bidding/price bands to unlock Rs-denominated peaking value.

3) Ancillary volumes were hefty; TRAS dominated downward balancing
8For 2025-10-07, SRAS Up totalled 9.833 GWh and TRAS Up 14.664 GWh; combined SRAS+TRAS showed Max MW ≈ 11,367.
Inference — Deep TRAS Down (-101.428 GWh) indicates prolonged periods of over-supply/over-schedule requiring down-regulation through the day.
Why it matters — Large regulation mileage implies tangible Rs exposure for procurers/generators; ancillary costs will track these sustained adjustments.

4) Frequency held near 50 Hz, but excursions were non-trivial
8All-India average frequency on 2025-10-07 was 49.992 Hz; excursions above 50.03 Hz occurred 150 times and below 49.97 Hz 186 times; FDI was 23.4.
Inference — Tight mean with frequent tails suggests continuous fine control (high “mileage”) rather than a placid day.
Why it matters — Even “good” frequency days carry hidden balancing effort and Rs spend; ancillary budgeting must reflect this volatility texture.

5) Merit-order exceptions emerged in SCUC schedule vs ECR ladder
8On 2025-10-07 (D-1 published), Sipat Stage-1 (161.2 paise/kWh) was flagged “NO” while higher-ECR units (e.g., Kahalgaon-2 at 303.7 paise/kWh) were “YES” across long blocks.
Inference — Network/ramping/location constraints overrode pure variable-cost stacking in those windows.
Why it matters — Dispatch costs won’t always mirror fuel merit; expect Rs/kWh drift when reliability/locational needs bind.

6) No ATC corridor violations; voltage discipline strong at 765 kV nodes
8System Reliability Indices for 2025-10-07 show 0% ATC-violation hours across WR↔NR, ER↔NR, NEW↔SR and NER import. Node table lists multiple 765 kV buses at 100% within band.
Inference — With ATC non-binding, price convergence conditions improved; any DAM-RTM spreads were driven by real-time supply, not corridor binds.
Why it matters — A congestion-free backbone lowers systemic Rs/MWh volatility and reduces congestion rent leakages.

7) Rajasthan saw a tight cluster of large thermal outages on 2025-10-06
8Rajasthan APS Unit-7 showed 700 MW under forced maintenance; Kawai-2 listed 660 MW forced; Chhabra-II had 660 MW under planned overhaul.
Inference — Concentrated regional deratings reduce native headroom, nudging imports or higher-cost dispatch the next day.
Why it matters — Local outage clusters can lift area prices in Rs/kWh and heighten reliance on inter-regional support.

8) HPX RTM printed zeros across all 96 blocks; liquidity concentrated on IEX
8On 2025-10-07, HPX RTM had 0.00 MW purchase, sell, cleared volume and MCP across the day.
Inference — Single-venue dependence for real-time discovery persisted; execution risk and slippage rise for larger RTM orders when liquidity is one-sided.
Why it matters — Participants seeking hedge depth should factor venue concentration into their Rs/MWh impact assumptions.
Click on Details for more
Details
It is easy to get month-old import data but it is difficult to solicit forthcoming shipment information in India. We go through a laborious process of data collection to get you full import information, including company-wise, quantity-wise, port-wise, vessel-wise cargoes which are coming into India in the next 15-to30 days.
Get the daily updates for :
8LNG
8Crude
8Chemicals
8Fertilizers
8Coal and Coke
8LPG
8Ammonia
8All tankers
8Bulk and Dry cargo
Click on Reports for more. Details
1) Pressure mounts as CERC evaluates PSP tender deviations
8Industry professionals are watching closely as CERC assesses proposed changes in PSP procurement, which could alter competitive dynamics and project timelines.
 
2) Strict branding rules set for PM Surya Ghar solar installations
8Vendors must adhere to stringent branding guidelines for solar rooftops, ensuring all materials align with the PM Surya Ghar scheme's approved identity.
 
3) No advance disbursement to prevent misuse of CFA funds
8MNRE explicitly prohibits advance CFA release, reinforcing a pay-after-performance approach.
 
4) All-India peak supply meets 99.9% of demand
8With only a 0.1% shortfall, India’s grid shows robust stability and operational resilience.
 
5) Western Region maintains perfect energy balance
8Maharashtra, Gujarat, and Madhya Pradesh met 100% of their energy needs, reflecting strong grid and generation capacity.
 
Click on Details for more
Details
 For reference purposes the website carries here the following tenders:
 
8Design, fabrication, supply, installation, testing commissioning of 603 kW of grid connected solar PV power plants  Details
  
8Design, fabrication, supply, installation, testing, commissioning with meter and allied works of 160 kW solar project Details
  
8Tender for supply, erection, testing, commissioning including five years insurance and comprehensive operation and maintenance of total 06 meter height 200 WP capacity solar highmasts Details
  
8Design, fabrication, supply, installation, testing commissioning of 214 kW of grid connected solar PV power plants Details
  
8Tender for construction of retaining wall Details
  
8Tender for shifting of HT LT poles HT/ LT lines Details
  
8Tender for contract for the vertical extension of the coal pile retaining structure Details
  
8Tender for job contract for ash disposal weighment Details
  
8Tender for supply, retrofitting, testing and commissioning of air circuit breakers with numerical relay Details
  
8Tender for DPR DE PMC for doubling of track Details
  
8Tender for proposal for the reconditioning of gas turbine Details
  
8Tender for complete reconditioning of 1.6 MVA station yard Details
  
8Tender for replacement of draft tube drain valve along with pipe Details
  
8Tender for SITC of CTs and PTs for commissioning of installed energy meters Details
  
8Tender for routine repair and maintenance of civil structures Details
  
8Tender for work for supply installation testing and commissioning of lighting pole with its accessories Details
  
8Tender for procurement of LT CT sets of assorted ratios Details
  
8Tender for annual service contract for chemical treatment Details
  
8Tender for installation of 1 No. tyre wash station Details
  
8Tender for construction of all technical civil works Details
  
8Tender for routine maintenance work of milling system Details
  
8Tender for changing of old raw water pipeline Details
  
8Tender for supply of jaw type coal sampler and coal sampler crusher Details
  
8Tender for work of attending boiler tube leakage Details
  
8Tender for augmentation of 400/220 kV substation Details
  
8Tender for augmentation of 132 kV S/Stn Details
  
8Tender for supply of ash handling spares Details
  
8Tender for augmentation of 220 kV substation Details
  
8Tender for supply of ash handling spares Details
  
8Tender for augmentation of 220kV S/Stn Details
  
8Tender for augmentation of 220kV substation Details
  
8Tender for estimate for 11 kV line Details
  
8Tender for estimate for 11 kV line conductor Details
  
8Tender for procurement of 120KN and 160KN EMS porcelain disc insulator Details
  
8Tender for procurement of metallic expansion joints of air and gas path installed Details
  
8Tender for preventive maintenance and emergency breakdown works in EHT lines Details
  
8Tender for providing stub setting, concreting, tower erection , stringing of 230kV SC line on DC tower Details
  
8Tender for work contract for erection of 33kV link line Details
  
8Tender for providing stub setting, concreting, tower erection , stringing of 230kV SC line Details
  
8Tender for supply of MS bolt nut Details
  
8Tender for manufacture, fabrication, supply, erection, testing and commissioning of 33/11 kV SS with 2X8 MVA power transformers, associated equipments, accessories, control panels Details
  
8Tender for manufacture, fabrication, supply, erection, testing and commissioning of 33/11 kV SS with 2X8 MVA power transformers, associated equipments, accessories, Details
  
8Tender for manufacture, fabrication, supply, erection, testing and commissioning of 33/11 kV SS with 2X8 MVA power transformers Details
  
8Tender for stringing of panther conductor Details
  
8Tender for complete overhaul of APH A and B sides and other related works Details
  
8Tender for execution of works contract for capital, DCW, improvement, HT/LT lines Details
  
8Tender for execution of works contract for capital, DCW, improvement, HT/LT lines and DT maintenance works Details
  
8Tender for supply and erection of works contract for provision of 33 kV source feeder Details
  
8Tender for providing stub setting, concreting, tower erection , stringing of 230kV SC line Details
  
8Tender for supply, installation, testing and commissioning of UPS batteries Details
  
8Tender for providing stub setting, concreting, tower erection, stringing of 230kV SC line Details
  
8Tender for supply of 11kV polymer composite pin insulators Details
  
8Tender for running contract for extension improvement works Details
  
8Tender for supply, erection, testing and commissioning of new 33/11kV substation Details
  
8Tender for running contract erection of 50 MVA power transformer Details
  
8Tender for repair and renovation of project dispensary, sub-station Details
  
8Tender for protection and stabilization work of hill slope along Details
  
8Tender for procurement of hydraulic torque wrenches and accessories for 76 MW turbines Details
  
8Tender for annual maintenance contract for various O and M activities Details
  
8Tender for replacement of dog conductor Details
  
8Tender for replacement of weasel conductor Details
  
8Tender for installation of different capacity DTR Details
  
8Tender for renovation and maintenance unde and yard of 33/11 kV sub station Details
  
8Tender for replacement of weasel conductor Details
  
8Tender for construction of record room with tin shed on electricity distribution Details
  
8Tender for special M and R works of electricty distribution Details
  
8Tender for special repair of electricity distribution Details
  
8Tender for augmentation of transformation capacity by replacement of 2x25 MVA, 220/33 kV power transformer Details
  
8Tender for retrofitting of existing not in servicre 220kV busbar Details
  
8Tender for augmentation by replacement of 01X25 MVA,132/33 kV power transformers Details
  
8Tender for comprehensive AMC of air conditioning system Details
  
8Tender for supply of proportional valve for turbine governing system Details
  
8Tender for erection, dismantling and maintenance of HT/LT line and transformer Details
  
8Tender for supply of 6.6KV, 261KW, HT motor for conveyor Details
  
8Design, manufacturing, testing, commissioning and installation of CBMS Details
  
8Tender for supply of various consumable items Details
  
8Tender for supply of H2 leak detector cum alarm & display system including design, engineering, erection, testing and commissioning for 7x210 MW & 1x800 MW Units Details
  
8Tender for rate contract of excavation and laying of new power / control / telephone cables Details
  
8Tender for maintenance contract for complete servicing/ overhauling/ attending fault/ repairing/ checking various types of hoist cranes Details
  
8Tender for supply, erection, testing and commissioning of 220V DC 375AH, Ni-Cd type battery set Details
  
8Tender for repair and overhauling service cooling water pump Details
  
8Tender for work of 6.6 kV HT motors Details
  
8Tender for IBR work of attending boiler tube leakages Details
  
8Tender for work of 220 kV line and breaker isolator Details
  
8Tender for bi-annual rate contract for erection of 66/132/220kV line Details
  
8Tender for mechanical & stub strengthening of 66kV line Details
  
8Tender for Bi-ARC for the emergency restoration of power of 66kV,132kV & 220kV transmission line on tower Details
  
8Tender for Bi-ARC for erection of 66/132/220kV lines Details
  
8Tender for work of mechanical strengthening and stub strengthening of existing 66kV line Details
  
8Tender for work of mechanical strengthening and stub strengthening of existing 66kV line Details
  
8Tender for supply of various size and types of conveyor belt carrying, impact & return rollers Details
  
8Tender for work of refurbishment of primary air fan rotor assembly Details
  
8Tender for repairing and augmentation of existing drainage network Details
  
8Tender for procurement of various types of HT and SS fasteners Details
  
8Tender for erection work of interconnection of 220kV D/C line Details
  
8Tender for erection of 66kV SS equipment, structures, control wiring etc Details
  
8Tender for BRC for the work of manual of bottom ash from bottom ash hopper of boiler Details
  
8Tender for work of attending daily, routine defects, preventive, breakdown, shutdown and emergency maintenance of various auxiliaries Details
  
8Tender for work of supply, erection, testing and commissioning of additional 50MVA. 132/33kV power T/F Details
  
8Tender for work for second circuit stringing on existing 132 kV DC line Details
  
8Tender for supply, installation, testing & commissioning of 1.5 TR &2.0 TR split type variable Details
  
8Tender for retrofltting of existing not in service 220kV busbar Details
  
8Tender for work of comprehensive audit based on fault current dissipation functionality and reliability assessment at various EHV S/Stns Details
  
8Tender for annual maintenance contract for servicing, repairs and maintenance of 48V, 110V & 220V DC battery sets & battery chargers Details
  
8Tender for dismantling of anjur earth electrode station and shifting material Details
  
8Tender for work of renovation of existing earth mat and augmentation of earthing arrangement Details
  
8Tender for work of supply, civil, ETC works of augmentation of substations Details
  
8Tender for work of biannual AMC for plenned and breakdown /emergency substation maintenance work along with spares Details
 
You can also click on Tenders for more
 
For reference purposes the website carries here the following newsclips:
 
8Loom Solar Expands Into Utility-scale Solar With Four Nationwide Plants Details
  
8BP to expand India presence with gas, solar and downstream push Details
  
8Infra stock jumps 3% after receiving Rs 13 Crore order for solar energy projects Details
  
8Electric vs petrol cars: Gadkari says prices to equalise within six months Details
  
8India's EV market stands at third position globally with a size of Rs 22 lakh crore Details
  
8India bears a special responsibility because Global South nations look to us for inspiration Details
  
8CERC admits solar firms' plea over losses from transmission delays Details
  
8KP Group Signs Landmark MoU with South Korea’s Jeonbuk, AHES, and GH2 to Boost Global Green Hydrogen Expansion Details
  
8Dilip Buildcon shares rise nearly 2% after bagging solar project in Madhya Pradesh Details
  
8Hero Future Energies Secures Over Rs 1,900 Crore for Kurnool Hybrid Project Details
  
8PVV Infra secures 2 solar pacts worth Rs 799 Crore Details
  
8New study reveals 3,343 GWp deployable ground-mounted solar potential in India Details
  
8MIT-WPU researchers develop scalable solar PV waste recycling process Details
  
8Tata Chemicals and 3 other stocks leading India’s EV Battery and Green Energy Growth Details
  
8Enphase Energy (ENPH) Introduces New Battery System in India Details
  
8Will Ola’s new ferrite motor save Indian EV sector from China Details
  
8In a first, renewables generate more power than coal globally Details
  
8Five aides of Maulana Tauqeer Raza face Rs 1.25 Crore notice over power theft Details
  
8India's first private-sector nuclear tender plagued by cost, funding issues Details
  
8Build lines before green projects are awarded Details
  
8CEA Proposes Draft Regulations To Strengthen India’s Power Infrastructure And Cybersecurity Details
  
8As govt eases N-power restrictions, how India’s SMR ambitions will get private sector boost Details
 
You can also click on Newsclips for more Details
1) 220 kV and 132 kV line bays expansion set for October 2026
8The expansion of line bays at Kurawar Substation is set to meet critical regional power demands by late 2026, reflecting a well-timed approach to power distribution.
 
2) Rs. 428 crore investment earmarked for Bhuj-II power station expansion
8Powergrid's proposed upgrades at Bhuj-II involve a substantial financial commitment, signaling confidence in the region's growing power consumption and infrastructure needs.
 
3) Regulatory shifts expose potential price deviations in EPC contracts
8The tender reveals regulatory changes likely to influence cost structures in EPC contracts.
8This could lead to deviations from traditional pricing models, affecting bid competitiveness and project viability.
 
4) Strategic policy shifts signal India's evolving energy priorities
8The document outlines strategic policy changes reflecting India’s shifting focus towards energy security and sustainability, impacting long-term investment strategies.
 
5) Power transmission boost linked to 800 MW renewable energy projects at Bikaner
8The integration of line bays for Furies Solar and SJVN Green Energy's projects at Bikaner-IV underscores a strategic pivot towards renewables.
8This capacity enhancement will significantly influence energy flows and market competition in the region.
 
Click on Details for more
Details
1) Haryana's cross-subsidy surcharge recalibration ordered by tribunal
8A tribunal mandates Haryana regulators to re-evaluate cross-subsidy surcharges using detailed, data-driven methods, potentially reshaping tariff structures.
 
2) SECI mandates cluster model for hydrogen hub DPRs amid logistical challenges
8The call for proposals stresses a cluster-based approach to enhance the viability of hydrogen production and utilization, mitigating long-distance transport hurdles.
 
3) New waste to energy rules: flexibility in project documentation
8By allowing self-declarations and reducing mandatory inspection reports, the MNRE facilitates greater flexibility and autonomy for developers in the project documentation process.
 
4) Hydro project timelines at risk as UERC mulls Greenko Budhil case
8The ongoing legal proceedings could extend project timelines, affecting financial planning and operational readiness for involved parties.
 
5) Uttarakhand's Greenko hydro project faces tariff recalibration amid cost challenges
8The regulatory dispute over cost escalations in a key hydroelectric project may lead to revised tariffs, highlighting the critical need for transparent cost management practices.
 
Click on Details for more
Details
1) APTEL underscores procedural diligence in upcoming energy sector hearings
8The Appellate Tribunal for Electricity's directive for thorough preparation underscores the necessity for legal teams to ensure compliance and readiness, impacting the pace and outcome of sector-related appeals.
 
2) Tata Power's regulatory battles span multiple states and years
8Tata Power Company Limited is embroiled in regulatory disputes across Maharashtra, Jharkhand, and Delhi, indicating strategic challenges in navigating state-specific electricity regulations.
 
3) Adani Electricity Mumbai Limited's regulatory challenges in Maharashtra
8Adani Electricity Mumbai Limited faces ongoing legal battles with the Maharashtra Electricity Regulatory Commission, underscoring potential delays and regulatory hurdles in the region’s power distribution framework.
 
4) Cyber security compliance costs may rise under new CEA draft regulations
8The CEA's focus on cyber security could increase compliance expenses for power sector companies.
8Businesses must budget for potential investments in cyber resilience.
 
5) 2025 regulations propose shake-up in electrical plant construction standards
8The draft regulations suggest comprehensive updates to construction norms, potentially impacting project timelines and cost structures for new electrical infrastructure projects.
 
6) Structural issues hinder Haryana's tariff compliance, Tribunal finds
8HERC's tariff processes are stymied by data gaps at higher voltages, prompting Tribunal intervention for regulatory adherence.
 
Click on Details for more
Details
1) PTC India Ltd's legal contest with central regulator underscores compliance complexities
8PTC India Ltd's ongoing litigation with the Central Electricity Regulatory Commission reveals underlying compliance challenges and regulatory hurdles within India's power sector.
 
2) Recurrent legal challenges for Adani and Torrent Power in regulatory ecosystem
8 Adani and Torrent Power frequently appear in regulatory disputes, indicating ongoing challenges within India's electricity regulation framework.
 
3) BYPL exits SECI tender citing uncompetitive RTC tariff rates
8 BSES Yamuna Power Limited steps back from a SECI procurement plan, citing high tariffs and better alternatives, reshaping competitive dynamics in Delhi's energy landscape.
 
4) Delhi's BRPL secures 2000 MW Solar + BESS at Rs. 3.53/kWh
8 BRPL opts for a more competitive Rs. 3.53/kWh tariff by securing 2000 MW of Solar + BESS, in stark contrast to the Rs. 4.98/kWh RTC bid.
 
5) Regulatory oversight keeps NDMC's PPAC within consumer-friendly limits
8DERC's decision to cap NDMC's PPAC at 8.75% ensures consumer protection amidst rising power purchase cost claims.
 
6) JSERC stipulates full-time exclusivity for new Electricity Ombudsman appointment
8The Commission mandates that the appointed Electricity Ombudsman must serve exclusively in this capacity, ensuring dedicated focus on resolving consumer grievances in Jharkhand's power sector.
 
Click on Details for more
Details
8Find a snapshot of thermal, hydro, pumped storage,
solar, wind, BESS and T&D contracts related updates for the day
Click on Reports for more Details
8PGCIL’s latest ERS award continues its nationwide gridresilience rollout. Four domestic bidders competed but Advait’s offer maintained price discipline and technical compliance. The outcome reflects a stabilised supply chain and reinforces India’s emergency restoration capacity. Details
8Broad participation shows the rise of a local ERS supply chain. Competitive pricing proves indigenous design maturity. PGCIL now benefits from a balanced vendor ecosystem. Rs 79.7 crore contract awarded for 400kV gridresilience package under PGCIL’s ERSIII procurement drive aimed at strengthening emergency restoration capacity. Details
8PGCIL’s latest ERSI package signals growing reliance on indigenous suppliers for highvoltage restoration assets. The Rs 87.96 crore award goes to HiTech Systems edging out two recurring contenders. The result underlines both vendor consolidation and transmissionresilience prioritization. Details
REC Jalna AIS amendment centralises payments and guarantees under MSETCL, tightening control but raising state exposure
8The first amendment to REC’s Jalna AIS RFP quietly rewires who pays and who guarantees. By making MSETCL the sole nodal agency and beneficiary of performance bonds it reshapes cashflow governance in state TBCB projects. The change strengthens oversight but also loads more risk onto the utility’s balance sheet.

Reinforcement beyond RE evacuation lines — PGCIL Gadag
8While most PGCIL works in Karnataka centre on RE evacuation this package underscores longterm site sustainability. A robust storage block helps absorb logistic shocks during major grid upgrades. It also hints at backintegration of O&M functions. Details
TANGEDCO GeM tender tightens liquidity rules but opens doors to new transformer manufacturers
8TANGEDCO’s Rs 1.26 crore EMD and 72month PBG conditions raise the financial bar for bidders yet a new policy lets firsttime manufacturers bid for entire quantities. By moving its 6637unit transformer procurement to the GeM portal the utility seeks greater price discipline and local participation. Whether this hybrid model broadens competition or concentrates it remains the market’s key question.

Unique Rs 79 crore HPPTCL reimbursement clause stands out
8The TSP must compensate HPPTCL for shared line assets a rare cost transfer in TBCB history. This tests tariff neutrality within multiagency projects. Financial structuring will be crucial. Details
Four successive extensions delay Ramagundam pumped -storage bid
8The closing date moved from 12 September to 10 October 2025 after four extensions. Each push stemmed from internal document alignment. Such repetition exposes GeM’s rigidity for complex packages.

High EMD signals screening strategy — RVUNL 500MW BESS
8With Rs 42 crore EMD—about 2 percent of estimated cost—RVUNL sets a high bar for entry. Only financially strong consortia can compete. This reduces the risk of post -award defaults. Details
Financial filters reshape coal -haul eligibility — NTPC North Karanpura
8A Rs 1 crore EMD and Rs 63.6 crore turnover bar exclude smaller transporters across NTPC thermal projects in India. Working-capital lock-up rises sharply in NTPC thermal projects in India, tightening liquidity for mid-tier bidders. Only operators with strong balance sheets and own fleets will qualify—a pattern consistent with NTPC thermal projects in India and likely to persist as NTPC thermal projects in India standardises higher thresholds.

Sixth extension pushes NEEPCO’s Tato -I hydro consultancy tender into late October
8NEEPCO’s consultancy tender for the 186 MW Tato-I Hydro Electric Project has now been extended six times, closing on 27 October 2025. In the Hydropower project tenders space, the GeM-based milestone model marks a shift from conventional PMC contracts. The slow response unusual for Hydropower project tenders reflects market unease with output-linked accountability. For Hydropower project tenders across the Northeast, this milestone approach is a notable test case. Observers of Hydropower project tenders will read the sixth extension as a signal of bidder caution.

Details
1) RTM printed sub-Rs 1/kWh troughs in the 02:00–03:15 window
8Blocks 02:00–02:15 and 02:15–02:30 cleared at ~Rs 1.00/kWh; 03:00–03:15 was ~Rs 1.00–1.01/kWh.
Inference — Deep off-peak sell overhang compressed RTM despite steady buy interest; aligns with abundant night-time flexibility.
Why it matters — Portfolios leaning on RTM captured outsized savings overnight; procurement teams should budget these “floor” windows.

2) DAM held near Rs 2.88/kWh as purchase bids rose ~11.56% pre-dawn
8From 00:00 to 04:15, purchase bids increased 7,698→8,588 MW (+11.56%) while MCP eased ~0.22% (2,886.66→2,880.22 Rs/MWh).
Inference — A relatively elastic sell stack absorbed higher demand without price lift in early hours.
Why it matters — For base procurement, DAM offered price stability even as utilities ramped positions.

3) Hydro-peaking auction ran sell-only all week; zero cleared energy
8Across 2025-09-30 to 2025-10-06, purchase bids = 0.00 MWh daily; sell bids ~0.94–1.22 lakh MWh; final scheduled 0.00 MWh.
Inference — Buyers met flexibility via DAM/RTM and reserves, leaving HPDAM without takers.
Why it matters — Hydro/PSP peaking value went unmonetised; product design or bidding strategy may need revision.

4) Merit-order anomaly: higher-ECR units scheduled while cheaper units sat out
8Korba-Stage-3 (ECR 145.9 paise/kWh) and Korba Stg 1–2 (148.6) flagged “NO” scheduling; Kahalgaon-2 (303.7) and Singrauli (195.7) flagged “YES” across long blocks.
Inference — Constraints/locational needs overrode pure variable-cost stacking on 2025-10-06.
Why it matters — Dispatch costs can exceed pure fuel merit; expect Rs/kWh drift where network or ramping needs dominate.

5) Frequency clustered tightly, yet variability remained non-trivial
8Average frequency 50.016 Hz; 49.95–50.05 Hz occupied ~66.06% of intervals; FDI at 33.9 with σ≈0.0889 Hz.
Inference — Control held the mean but required continuous fine adjustments (high “mileage”).
Why it matters — Ancillary budgets must account for sustained regulation effort even on “good” days.

6) Eastern 765 kV nodes showed textbook voltage discipline
8Ranchi NEW 765 kV spent 100.00% time within band (0.00% below/above); average ≈ 780.24 kV.
Inference — VAR/tap settings and local support held without excursions through T1–T96.
Why it matters — Reduced losses and tripping risk; a reliability benchmark for adjacent corridors.

7) Overnight DAM–RTM basis widened to ~Rs 1.60–1.75/kWh in select blocks
8At 02:00–02:30, DAM MCP ≈ Rs 2.60–2.75/kWh while RTM MCP printed ~Rs 1.00–1.65/kWh.
Inference — Real-time sell pressure outpaced day-ahead conditions, opening tactical buy-RTM/lock-DAM spreads.
Why it matters — Active traders could hedge peaks with off-peak RTM, saving ~Rs 1.2–1.7/kWh in those windows.

8) HPX RTM activity was effectively nil on 06/10/2025
8HPX RTM snapshot shows zeroes across purchase/sell/cleared/MCP for the day.
Inference — Liquidity concentrated on IEX for RTM, raising execution risk on thinner venues.
Why it matters — Single-venue dependence can amplify price impact and slippage for larger RTM orders.
Click on Details for more
Details
8PGCIL’s latest ERS procurement adds another layer to India’s grid-resilience armour, underscoring the scale of Transmission equipment tenders in India. IAC Electricals clinched the Rs 85.6 crore package after competing with three seasoned vendors, a result that reflects the competitive dynamics typical of Transmission equipment tenders in India. The award extends PGCIL’s phased rollout of 400 kV emergency restoration kits across critical corridors, reaffirming the momentum of Transmission equipment tenders in India within grid-hardening programs and signaling continued opportunities across Transmission equipment tenders in India. Details
 1 2 3 > 

Showing 1–50 of 103 items