8All-India, 6 July: 235 GW met at 21:31, shortage three-hundredths of a percent 8Frequency detail: min 49.465 Hz at 19:48, max 50.296 at 11:29, 8.8 hours out of band 8SR's Monday line trips: five 400/220 kV forced outages, all restored same day 8WR carries 7,928 MW of forced thermal outage plus 1,468 MW of forced hydro 8The balancing bill: SCUC commits 71 GWh up while reserves despatch 81 GWh down 8ER's forecasters had a bad Monday: 6.34% day-ahead error, saved intraday 8NER's evening peak: 3,603 MW met in full at 49.83 HzDetails
8Wind out-generates solar for the country: 655 MU against 474 on 4 July 8Tamil Nadu's wind machine: 187 MU in a day, a fifth of the extended fleet's national output 8How the new green categories will actually work on screen 8Standing clearance is the new gate: NOAR decides who counts as Wind, DRE or Other 8AgriPV's big claim: cropland solar alone could meet India's 2050 demand 8UP's zone-wise solar margin sheet: where the transmission headroom isDetails
8Monday's DAM: buyers return, price snaps back 54% off the Sunday floor 8RTM clears 196 GWh at Rs 3,353 - volumes hold even as the day-ahead book thins 8G-DAM's last week under the old flags: prices halve, solar carries 48% of clearance 8Day-ahead contingency prints from Rs 1,206: the quiet bargain bin of 6 July 8PXIL's intraday: a week of sell offers into a buyerless book 8ASDAM flatlines: zero bids, zero trades, nine straight sessions 8The Rs 2,124 gap between headline and weighted MCP - what 30 June's spread said about block scarcityDetails
For reference purposes the website carries here the following tenders: 8Tender for supply of various types of clamp for 220 kV switchyard Details 8Tender for work contract to providing assistance in operation, maintence, store, camping house work Details 8Tender for work contract for providing assistance in unit operation and HR operation of 2x10 MW Details 8Tender for procurement and erection of rigid type discharge electrode with fixing clamp arrangement Details 8Tender for engaging agency for carrying out environment impact assessment and environment management plan (ElA/EMP) studies for the proposed 1X800MW coal based ultra supercritical unit Details 8Tender for temporary protection of 220kV D/C line Details 8Tender for construction of 33 kV substation Details 8Tender for construction of double-pole plinths Details 8Tender for construction of C type tower Details 8Tender for shifting of electrical lines and transformers Details 8Tender for supply of materials and erection for construction of 33/ 11 kV substation Details 8Tender for replacement of damaged 33 kV feeder line Details 8Tender for supply of materials and work of shifting/height of 132kV line Details 8Tender for water proofing treatment over terraces Details 8Tender for replacing damaged raw water pipe line and drinking water pipe line Details 8Tender for annual operational and maintenance contract for 220KV single circuit transmission lines Details 8Tender for supply, erection & commissioning and testing of emission control device/equipment Details 8Tender for erection for 66kV Baraya substation Details 8Tender for execution of miscellaneous additional civil works related to 2X5MVA 66 KV/11 kV substation Details 8Tender for exploratory drilling works of 380 m length Details 8Tender for repair and maintenance work in basement Details 8Tender for supply, installation, integrating, testing and communing of radar type water level sensor for monitoring of reservoir level Details 8Tender for application of surface protective coating on spiral casing, stay rings, stay vanes Details 8Tender for procurement of sulphuric acid 98 percentage purity 460 MT Details 8Tender for procurement of 11kV standalone complete set Details 8Tender for constructing HT OH using covered conductor Details 8Tender for supply of tripper trolley wheel Details 8Tender for fabrication of turbine exhaust piping Details 8Tender for procurement of turbine spares required Details 8Tender for supply and erection of 3T hoists Details 8Tender for procurement of ABEL pump spares Details 8Tender for supply, installation, testing and commissioning of high-performance energy chain for travelling tripper Details 8Tender for replacement of existing MS BAT platform with FRP platform Details 8Tender for procurement of 9 meter long PCC 200Kg- WL poles Details 8Tender for work of 33/11 kV substation Details 8Tender for annual cleaning of approach channel area adjacent to trash rack jali intake structure Details 8Tender for work of collection of samples for coal As fired Details 8Tender for construction of HT line Details 8Tender for replacement of old GI sheet roofing Details 8Tender for retubing and reconditioning of 2 Nos. of generator surface air cooler Details 8Tender for supply and replacement of existing 40 mm GI cooling water branch pipeline Details 8Design, manufacture, testing, supply and delivery of 415V 15Ckt ACDB Details 8Tender for stub strengthening muff repair and offshoot repair of 220kV Lehra Maur line Details 8Tender for stub strengthening muff repair and offshoot repair of 220kV line Details 8Tender for construction of 1X500 MVA, 400/220 kV sub-station Details 8Tender for construction of 220/132 kV bay at 220 kV GSS Details 8Tender for construction of toe wall, leveling, dressing and gravelling work and water harvesting Details 8Tender for construction of 400kV and 1 No. 220kV line for proposed 400 kV GSS Details 8Tender for construction of 32 kV bay Details 8Tender for construction work of 220 kV GSS Details 8Tender for procurement of large dia MS ERW pipes Details 8Tender for procurement of MS ERW pipes Details 8Tender for procurement of galvanized pipes required Details 8Tender for supply of triple screw pump spares for ball tube mill Details 8Tender for annual rate contract for supply of HT fasteners Details 8Tender for works of SH-RH crown plate sealing and APH center section Details 8Tender for supply of staircase step grills for crusher house Details 8Tender for replacement of 33 kV dog conductor with ACS AL-59 232 SQMM covered conductor Details 8Tender for replacement of 33 kV dog conductor Details 8Tender for procurement of heavy-duty pillow block bearings for wagon tippler Details 8Tender for refurbishment of damaged loading unit of 8.5E9 coal mill Details 8Tender for procurement of grinding elements of 8.5E ,10 coal mill Details 8Tender for OH of wet and bottom ash system Details 8Tender for supply of vertically operated 11 kV gang operated air break switch with composite polymer insulators Details 8Tender for supply of 11kV double pole AB switch SB 6 pole with insulators. Details 8Tender for supply of 11kV standalone structure material complete set Details 8Tender for work of overhauling, servicing, repair and maintenance of 245 kV circuit breakers Details 8Tender for procurement of 132kV cable joints for various EHV underground (UG) cables Details 8Tender for work of dissolved gas analysis of TF /ICT EHV grade TF oil at various Details 8Tender for supply of various items for cleaning, insulating & sealing of EOT control panel, 11kV panel Details 8Tender for supply of shaft sleeves for NVT pumps Details 8Tender for Bi -annual ARC for the work of shifting /height raising of various 66/132/220kV existing transmission lines Details 8Tender for erection of 66kV Bhadiya substation Details 8Tender for providing services on job work for various Details 8Tender for construction of new control room foundations, cable trench, compound wall and misc. civil works Details 8Tender for construction of new control room (G+1) (on pile) for shifting of existing control room, 11kV DP foundation Details 8Tender for erection of 66kV substation Details 8Tender for fabrication dismantling erection strengthening modification of various chutes hoppers wagon tipplers Details 8Tender for work of dye penetrant test (DPT), magnetic particle inspection (MPI), internal oxide scale measurement Details You can also click on Tenders for more For reference purposes the website carries here the following newsclips: 8Sunsure bags loan for 75-MWp open access solar project in India Details 8Premier Energies Secures Rs 3,011 Crore Solar Orders for 1,846 MW Cells and Modules Details 8ACEN selling stake in 100-MW wind project in India Details 8Tata Power commissions 100.8MW wind facility in Maharashtra, India Details 8Vayona Energy Starts Wind Turbine Blade Manufacturing in India Details 8Tata Motors powers up with Welspun Renewable Energy Details 8Panel clears coal supply for Torrent's Gujarat replacement power plant Details 8Coal Gasification Yet to Take Off in India Six Years After Policy Push Details 8MoSPI panel calls for granular tracking of India’s energy use as EV, off-grid gaps widen Details 8Jindal Steel Deploys Indigenous Coal Gasification in Global First for Steelmaking Details 8Shah asks CISF to enforce 'zero coal leakage plan' to plug illegal mining in Jharkhand's Dhanbad Details 8Coal India to establish Uttar Pradesh renewables JV Details 8Why Adani and UAE-Based IHC Are Betting $11.5 Bn in Odisha’s Aluminium Sector Details 8HM Amit Shah Orders ‘Zero Coal Leakage Plan Details 8India’s power sector in a reset, to hit 900 GW capacity by FY32E Details 8India plans national electricity data platform Details 8Private Capital Flows To Power As India’s Electricity Demand Surges Details 8India energy stack: The digital reform that could power India’s next decade of growth Details 8Reforms Propel India's Power Sector to Financial Resurgence Details 8India Plans Major Overhaul of Energy Database, Targets EV & Biofuel Data Gaps Details 8El Nino May Push India's Power Grid to the Brink, CREA Warns Details 8India Shifts Focus to Power Grid Details 8Indian Stock Markets Rise As Green Energy Stocks Deliver Mixed Performance On July 6 Details 8India's power discoms on recovery path as reforms strengthen financial health: Macquarie Details 8Rs 7.9 lakh crore power boom: Why India’s power transmission sector is a massive investment opportunity Details 8Power Transmission Sector Eyes Rs 7.9 Lakh Crore Investment Details 8India Power Grid at Risk as El Niño Threatens Record Energy Demand for 2026 Details 8Electric 3-Wheelers Consume 61% of India’s EV Power: MoSPI Report Details You can also click on Newsclips for moreDetails
It is easy to get month-old import data but it is difficult to solicit forthcoming shipment information in India. We go through a laborious process of data collection to get you full import information, including company-wise, quantity-wise, port-wise, vessel-wise cargoes which are coming into India in the next 15-to30 days. Get the daily updates for : 8LNG 8Crude 8Chemicals 8Fertilizers 8LPG 8Ammonia 8All tankers 8Bulk and Dry cargo Click on Reports for more.Details
8Five leading transmission developers have cleared the technical qualification stage for a strategically important EHV transmission project. 8A late engineering amendment quietly altered a key design requirement, setting the stage for a commercial battle where pricing strategy could prove as important as technical strength.Details
8An important design update has quietly altered technical expectations just before financial bids. 8Five qualified contenders must now balance compliance, execution complexity and commercial competitiveness in the next phase.Details
8A large renewable-linked transmission project has cleared a crucial qualification milestone with strong bidder participation. 8The next phase will reveal which contenders are willing to take the greatest pricing risk in pursuit of the contract.Details
8Serentica, Gamma and Pace Digitek all argued their queue-position cases on 29 June; all three orders are reserved. The rulings will be the operative case law on GNA closures and bank-guarantee deadlines.Details
8Every commercial obstacle to charging the 230 kV BHAVINI–Kancheepuram lines has cleared; PGCIL concurred on 27 June and TNSLDC’s approval is “expected shortly.” The PFBR’s wires are effectively done.Details
8The state’s own despatch stack prices its liquid-fuel tail at up to Rs 27.80/kWh against a Rs 10 exchange cap - and five HPX reverse auctions dated 4 July show it acting on the arithmetic.Details
8CEA’s ledger has hydro 4,666 MU behind plan, Srisailam 16 metres below last year, and Bhutan imports running at 197% of program. The overnight Rs 10,000 exchange caps are this deficit priced.Details
8ERPC’s disturbance report reconstructs the 1 May Jharkhand blackout step by step: a stuck R-pole breaker, a silent LBB, and a bus-coupler bay with no backup protection at all. 248 MW, 74 minutes.Details
8Purchase bids on IEX collapsed from 643,104 MWh to 230,017 MWh between 29 June and 5 July while sellers flooded in. But the driest June since 1901 says this is a wet week, not a cheap summer.Details
8Twelve overnight blocks cleared at the exchange ceiling on 3 July; by Sunday the real-time market was printing zero. Two markets are running inside one, and the average price hides both.Details
8Grid-India despatched nine units of downward reserve for every unit up on 5 July, with 1,500 MW of Ramagundam idled. Surplus management is now the control room’s main job - until the sun sets.Details
8Haryana’s commission admits Rs 2,767 crore against JSW’s claimed Rs 3,071 crore and lands the levellised tariff precisely on the Rs 4.50 PPA cap. The plant, unusually, is fourteen months early.Details
8Noida Power’s new tariff order projects revenue Rs 319 crore short of the approved ARR - and retains the 10% consumer discount regardless. The commission’s shield is a disputed surplus from the APTEL remand.Details
8Ganesan retires, Dwivedi takes the board portfolio in additional charge, Vallurie becomes CFO - all effective 1 July. The Director (Finance) seat and the CFO desk are, for now, two different chairs.Details
8The exchange announced a 15.9% volume jump and Rs 5.1/unit quarterly prices on 3 July - and its own tape printed Rs 2.5 within 48 hours. Volume is holding; the rupees are not.Details
8NTPC Renewable Energy contracted 1,200 MW to PTC India on negotiated terms on 3 July - one of the largest bilateral solar PPAs on record. Price, tenor and end-buyers are all undisclosed.Details
8SCADA data from multiple Karnataka substations stopped reaching the southern control room over two months ago and hasn’t resumed. The region’s biggest RE host is being operated partly blind.Details
8NRLDC and Delhi SLDC have an approved SOP to split the Bamnauli–Tughlakabad 400 kV ring every summer afternoon. The alternative on the table was a special protection scheme - this was judged more practical.Details
8Green day-ahead follows the grey market down - weighted price off 42% in a week 8RTM does record work at rock-bottom prices - 183 GWh cleared on a Sunday 8HPX’s day-ahead market: 2,308 MW of sellers, zero buyers, three days running 8PXIL prints a zero tape too - the entire spot market ran through one exchange 8NLDC sets next week’s ISTS loss at 3.49% - flat, despite the RE-heavy flows 8CERC’s February market report: Nepal bought 168 MU on the exchange - the subcontinent is balancing through Indian platforms 8Term and green-term markets stay thin against the collective segments - nobody locks a falling priceDetails
8PM inaugurates SJVN’s 1,000 MW Bikaner solar - Rs 5,492 crore, 5,000 acres, all-DCR modules 8Tata Power Renewable commissions 100.8 MW Jewali wind - and prices Rs 1,500 crore of debentures the same weekend 8Coal India signs an RE joint venture with UP’s generation utility 8GK Energy wins Rs 235.92 crore MSEDCL empanelment for 10,000 solar pumps - 60 days to deliver 8CareEdge confirms final AA+ on Ayana’s 740 MW restricted group - Rs 3,390 crore of facilities 8The REC market has effectively stopped: volumes down 81.4% 8UPNEDA rewrites its solar streetlight tenders around lithium - equalisation charging bannedDetails
8Demand sheds 20 GW in 48 hours into the wet weekend 8Sunday’s frequency ran wild in both directions - 49.65 to 50.302 Hz 8Northern-region import corridor breached ATC limits a tenth of the time 8Renewables hit 83.6 GW and 36.4% of demand met on 2 July 8Southern forced-outage log: a 1.79 kA earth fault and a failed arrester 8The 17:45 cliff: agricultural switching still rocks the southern grid at dusk 8Eastern region’s day-ahead demand forecast is off by 3.1%Details
8Haryana’s HPGCL runs down: PLF 73% to 36% in three days on a 70% coal stock 8Punjab sits on 140% of normative coal - the other end of the same table 8Jodhpur discom sets April FPPAS at 5.30% - and banks the extra 3 basis points 8Jaipur discom rewires its delegation of powers for big connections 8Rajasthan’s coal band: Rs 4.18 at Kahalgaon to Rs 6.53 at NUPPL 8NPCL’s green tariff carries no discount - a small clause with a signal 8kVAh billing at 10 kW and a Rs 50/kW penalty: the NPCL schedule’s fine printDetails
8SJVN’s review of the January truing-up order is admitted - hearing 25 August 8PGCIL asks CERC to revisit disallowances on 2019-20 additional capitalisation - 41 days late 8NHPC’s Teesta Low Dam-III tariff petition inches on - additional data due today 8NTPC’s Vindhyachal-III truing-up: four weeks for beneficiaries to answer 8RGPPL dispute timeline corrected: DNH-DD’s decade-old capacity-charge claim now hears 4 August 8WBES goes live with trader fields in bilateral contracts - and Telangana files the first bug reportDetails
8HNPCL’s challenge to its APERC multi-year tariff disposed on day one of the docket rush 8HPPCL’s three appeals against HPERC disposed - with a door left open 8ACME’s 368-day-late appeal gets in - on conditions, over a 300 MW evacuation fight 8The Rs-21 washery formula: MSPGCL’s review of the coal-rejects ruling 8GRIDCO’s review of its dismissed 2021-22 appeals resisted at the threshold 8DVC’s HT consumers get their nine-year-old appeal to draft judgment 8The clearing of the decks: APTEL’s 3 July cause-lists run to thousands of linesDetails
8CRISIL lifts BHEL to AA/Stable 8Jaiprakash Power’s bank-loan ratings withdrawn at its own request 8Schneider Electric Infrastructure raises its Kolkata switchgear bet by a third 8Quality Power lands a FACTS order from Japan 8Diamond Power to cable 310 MW of Hyderabad data centres 8GE Power India’s services pivot: order booking up 1.9x 8People and paper: KP Group’s new vice-chairman, a takeover-code footnote at Genus, and BCCL closes a 1989 caseDetails
8The 240th SRPC OCC meets Friday with the year’s heaviest agenda 8Protection sub-committee convenes 8 July on short-circuit levels and islanding readiness 8PSS tuning meet on 13 July names the untuned: LSR, NTTPS-8, Yermarus-1, Idukki 4 & 5 8ERPC’s action list: Amnour Bus-II back by 15 July, DR/EL discipline, and a May-tripping review 8Delhi’s OCC: TPDDL wants a date for the Shalimar Bagh transformer conversion 8Regulator recruitment watch: DERC applications closed, MERC interviews on, BSEB verifies engineers 8One register, 290 days: the planned-outage approvals nobody re-verifiedDetails
8Ranganadi misses its availability norm in June - 78.8% against 85% 8The northeast’s SCED bill: pool claws back Rs 4.3 crore from AGBPP alone 8A metering error at Kakrapar forces the west to reissue its entire June energy account 8Odisha’s reservoirs: Balimela two feet below last year, Rengali ten metres down 8The units-out register: Ropar-6 trips on protection, Pragati’s gas turbines stay stubborn 8What actually got built: the transmission commissioning trail in the outage files 8Gujarat publishes its RE-connectivity map: 814 substations with headline capacities and hard caveatsDetails
It is easy to get month-old import data but it is difficult to solicit forthcoming shipment information in India. We go through a laborious process of data collection to get you full import information, including company-wise, quantity-wise, port-wise, vessel-wise cargoes which are coming into India in the next 15-to30 days. Get the daily updates for : 8Crude 8Chemicals 8Fertilizers 8LPG 8Ammonia 8All tankers 8Bulk and Dry cargo Click on Reports for more.Details
8Hydro transformer package moves through unusually intensive clarification cycle before commercial competition Repeated technical revisions reveal that engineering certainty became the defining feature of this hydro transformer procurement. The unusually high volume of bidder clarifications signals far more than routine document housekeeping. 8Integrated GIS transmission package expands contractor responsibility through broader engineering and digital compliance requirements This latest GIS transmission package goes well beyond a conventional substation contract. Its technical structure quietly reshapes engineering responsibilities while introducing a stronger digital compliance framework. The implications for EPC competition and execution strategy extend well beyond this single project. 8Rs 2,254 crore hydro package undergoes repeated procurement reset before competitive bidding A mega hydro package is moving forward only after repeated procurement revisions. The biggest developments are emerging from changes outside the price bid rather than inside it. The implications for bidder participation, competition and execution strategy become much clearer in the detailed analysis. 8Transmission package enters new competitive phase after revised bidding calendar extends procurement timeline A revised procurement calendar has quietly altered the pace of a major renewable transmission corridor. While the engineering scope remains unchanged, the new timelines could reshape competitive positioning ahead of financial bidding. The implications extend beyond scheduling and may influence how major transmission developers approach the project. 8Bid schedule extended for Lakadia Phase-II Part-B transmission package as competition enters final stretch A major ISTS transmission package supporting western India's renewable power evacuation has received a revised bid schedule, giving prospective developers additional preparation time. While the submission timeline has been relaxed, the underlying commercial, technical and execution risk framework remains unchanged. The extension is expected to influence bidding strategy rather than alter the competitive structure.Details
It is easy to get month-old import data but it is difficult to solicit forthcoming shipment information in India. We go through a laborious process of data collection to get you full import information, including company-wise, quantity-wise, port-wise, vessel-wise cargoes which are coming into India in the next 15-to30 days. Get the daily updates for : 8LNG 8Crude 8Chemicals 8LPG 8Ammonia 8Coal & Coke 8All tankers 8Bulk and Dry cargo Click on Reports for more.Details
8Technical evaluation has concluded without significantly narrowing the field, leaving 40 manufacturers in contention for a major transformer procurement. 8With qualification hurdles cleared, the contest now shifts to commercial strategy, where pricing decisions are expected to determine the outcome.Details
8PVVNL has launched parallel procurement programmes covering two key transformer capacities under a common quality framework. 8The twin tenders suggest a wider distribution infrastructure strategy rather than isolated equipment purchases. 8The eventual bidding response will reveal how manufacturers price increasingly rigorous compliance expectations.Details
8Two procurement amendments from the same board meeting shift costs to vendors - delayed-payment interest down a quarter or more, earnest-money ceiling doubled to Rs 20 lakh.Details
8Commercial Circular 28/2026 operationalises the state’s new policy: eligible data centres and global capability centres will be billed as industry, not commerce.Details
8IEEFA’s June 30 note, read with the CEA’s rationalisation report it cites: the tariff structure leaks, and 900 GW of non-fossil ambition sits on top of it.Details
8Two CIL filings, one strategic picture: a Rs 2,831-crore renewables award lands the same week BCCL reports the steepest production decline in the group.Details
8The SRLDC’s July transfer-capability file shows one state where the wires can carry less than half of what has been contracted through GNA - and a date anomaly worth a phone call.Details
8The July 2 order trues up FY25, reviews FY26 and fixes FY27 ARR for Noida Power - the same discom that CARE lists as offtaker for 300 MW of group hybrid capacity.Details
8Three CARE rationales filed the same day map the group’s clean-energy leverage - and identify network access, not construction, as the binding constraint.Details
8CARE’s new AA− rating assumes three years of curtailment losses; IEEFA’s June 30 note counts ~300 GWh of renewable energy lost nationally in Q1 2026 to transmission constraints. Two documents, one problem.Details
8Review petition allowed June 30. The commission found SECI’s unilateral extension of supply-start dates - June 2026 pushed to January and June 2027 - violated the RfS, the award letters and the PPAs themselves; on default, HPSEBL gets the 75% waiver.Details
8Day-ahead prices rose 32.4% in a month when demand grew 11.6% and the monsoon ran 40% short. The exchange’s own release shows volumes shifting to real-time as buyers chase the shortfall intraday.Details
8The exchange’s own release supplies the explanation the desk flagged last edition: REC sell bids fell 86% year-on-year - supply withdrew, and the price of what remained rose.Details