All content in this website is sourced legitimately

Page No: 1
FGD system: Find out the RFQs expected
Feb 11: Project Name: Thermal Power Station: Installation of FGD
8Project Cost: 500 crores
8Project Description: A FGD system needs to be installed at a 1800 MW thermal power station. Fichtner Consulting Engineers is preparing the technical FGD design. RFQ are expected for a lump-sum turnkey contractor.
Find out the RFQs expected
Click here for more details


**********************************

Back  |  Top