Annual fixed charges allowed for transmission asset under Transmission System associated with RAPP project
Jan 03:
An average of Rs 38.85 Cr AFC allowed for 2022-24 tariff period for the following transmission asset 8400 kV D/C Kota-Jaipur line along with associated bays 850 MVAR Line Reactor at Jaipur in 400 kV D/C Kota- Jaipur line Click on Reports for more