All content in this website is sourced legitimately

Page No: 1
Download Tenders and Newsclips
Jul 16: For reference purposes the website carries here the following tenders:
8Tender for two years mechanical maintenance contract for entire ash handling plant Details
8Tender for procurement, erection & commissioning of 02 Nos High Mast Tower for CHP Details
8Tender for Construction of 33kV line ( UG cable) Details
8Tender for laying, testing and commissioning of 11kV XLPE UG cable Details
8Tender for Annual rate contract of TG associates and its auxiliaries equipments Details
8Tender for supply of Segmented Oil Baffle Seal Ring complete assembly for Drive Turbine Details
8Design, Engineering, Supply, Assembly, Testing, Civil Structural Works, Erection, Testing & Commissioning for ESP Details
8Design, Engineering, Manufacture, Civil, Structural & Architectural Works and Erection, Testing & Commissioning of DSI FGD System and Auxiliaries Details
8Tender for General Overhauling of TG Set including LPT, Generator & Associated Work Details
8Tender for routine, Preventive and Breakdown maintenance of Heavy Earth Moving Machinery Details
8Tender for supply, dismantling, erection, testing & commissioning of MV switchgear and LV switchgear Details
8Tender for Renovation & Modernization (R&M) for Life Extension of Power Station Details
8Tender for Annual Maintenance Contract for execution of work of Underwater Parts Repair and other works in Turbine Generator set Details
8Tender for Overhauling job of PA, ID & FD Fans, Gates and Dumper Details
8Tender for the overhauling job of Boiler Pressure Parts Details
8Tender for Procurement of Grinding Roller Tyre for pulverized coal mills Details
8Tender for civil, structure and architectural work for FGD Project Details
Click on Tenders for more
For reference purposes the website carries here the following newsclips:
8Easing the electricity distributor’s burden Details
8Changing business models in energy sector Details
8Uttarakhand High Court dismisses PIL seeking cancellation of hydel projects in Rishi Ganga Details
8India's power consumption returns to pre-Covid level in July; up 17% Details
8India will reduce more than targeted 33 pc carbon emission by 2030: Power Minister Details
8China to release more than 10 million tonne of coal from reserves Details
8Green power to help RInfra-led BSES, Delhi consumers save Rs 800 cr/yr Details
8Govt plans to shift public transport, logistics to clean energy source: Gadkari Details
8Electricity demand growing faster than renewables: IEA Details
8RPower allots 59.5 cr shares, 73 cr warrants to RInfra Details
8TVS Motor to invest Rs 1,000 crore in electric vehicles, sets up a dedicated vertical Details
8Govt to float 4,000 MWh battery storage tenders: Power Minister R K Singh Details
8Honda willing to form alliance to make electrification profitable Details
Click on Newsclips for more


**********************************

Back  |  Top