Mar 08: For reference purposes the website carries here the following tenders: 
8Annual Contract for the work of routine breakdown & capital maintenance work of LT switchgear Details
8Tender for Supply of Transformer Oil Details
8Tender for Laying of tower foundations ,Erection of towers and stringing & sagging of conductor with earth wire Details
8Tender for Up gradation of ABT Management System (including supply of ABT compliant energy meters) Details
8Tender for Supply of Conveyors Rollers Details
8Tender for Fabrication, Repairing work of Roller Coal Mills Details
8Supply of Vera Bar Used in Primary Air Flow Measurement in PA Duct To Coal Mill Details
8Annual contract of Routine, Breakdown and Capital Maintenance work of Roller Coal Mill Details
8Tender for Operation assistance fly ash conveying of ESP passes, APH and Duct Hoppers Details
8Supply of spares for air circuit breakers Details
8Annual running contract (ARC) of TG System/ Equipments Details
8ARC for Desiltation of feeder channels Details
8Tender for Establishment of 132/33kV substation along with transmission line Details
8Tender for Routine mechanical maintenance and lubrication of equipment’s Details
8Tender for R&M and Uprating of Auxiliaries ans related Boiler works Details
You can also click on Tenders for more
For reference purposes the website carries here the following Newsclips:
8Govt approves Rs 31,560-cr investments for power projects. Details
8Hartek Group looks for Rs 100 crore funding to fuel growth Details
8Azure Power Wins 300 MW in 1.2 GW ISTS SECI Solar Auction Details
8Cabinet clears nearly Rs 26,000-crore investment for 2 thermal, 1 hydro power projects Details
8Govt nod to Khurja power plant in UP big blow to public health and wealth: Greenpeace India Details
8Discoms cannot evade late payment surcharge Details
8ReNew Power raises $375 mn via green bonds Details
8PM to launch projects worth Rs 65K-cr in Kanpur today Details
8Cabinet approves coal supply to short-term PPAs; Renewable status to hydro plants, Rs 21,000 cr power plants in UP, Bihar Details
8Solar power generation 5.8 per cent costlier with GST: Report Details
8Cabinet approves renewable status for large hydro power projects Details
8Power Minister rules out mega consolidation of power sector PSUs Details