|
Sep 07:
India's Open Access regime-V: Stranded capacity not valid worry, asserts power min
Details
|
|
Sep 07:
India's Open Access regime-IV: SERCs to take stringent action against breach of PPAs, but with a caveat
Details
|
|
Sep 07:
India's Open Access regime-III: Discoms may levy standby charges
Details
|
|
Sep 07:
HEPs in Bhutan-III: Centre apprehensive about private sector participation
|
|
Sep 07:
HEPs in Bhutan-II: Bhutan resistant to change in hydel tariff formula
|
|
Sep 07:
HEPs in Bhutan-I: Planning commission's HRD outlay too high, feels MoP
|
|
Sep 07:
India's Open Access regime-II: MoP refuses to tinker with cross-subsidy surcharge
Details
|
|
Sep 07:
India's Open Access regime-I: Discoms, regulators still at odds
Details
|
|
Sep 07:
CERC Briefs
|
|
Sep 07:
MoEF's Committee for HEPs holds 40th meet: Download minutes
|
|
Sep 07:
Lanco refutes allegations of environmental damage against Phata-Byung HEP
|
|
Sep 07:
MoEF castigates HPPCL for shoddy background work on Nakthan HEP
|
|
Sep 07:
Threat to India's final ecological frontiers-II: Jaiprakash's proposal for Kynshi-II HEP likely to have wide ramifications for Meghalaya
|
|
Sep 07:
Threat to India's final ecological frontiers-I: MoEF clears 500 MW Emini HEP in Dibang Valley
|
|
Sep 07:
Threat to India's final ecological frontiers-III: Jindal's Subansiri Middle HEP to end life of 72 families as they know it
|
|
Sep 07:
Work suspended at L&T's Singoli-Bhatwari HEP in Uttarakhand
|
|
Sep 06:
Cabinet Secretariat calls for investigation of CWG projects
Details
|
|
Sep 06:
MoP, DHI finally wake up to BoP shortfall
Details
|
|
Sep 06:
Competitive bidding for captive coal blocks-I: Most states support move, asserts coal min
Details
|
|
Sep 06:
Competitive bidding for captive coal blocks-II: CMPDIL integral to process
Details
|
|
Sep 06:
Competitive bidding for captive coal blocks-III: In-advance preparation of preliminary reports not possible
Details
|
|
Sep 06:
Competitive bidding for captive coal blocks-III: MoC delineates rough outline of process
Details
|
|
Sep 06:
Competitive bidding for captive coal blocks-V: MoC dismisses naysayers
Details
|
|
Sep 06:
BEE forms policy advisory committee
Details
|
|
Sep 06:
List of XI Plan NTPS under construction
Details
|
|
Sep 06:
Technical Standards Regulations 2010-I: Operational flexibility mandated for TPPs
Details
|
|
Sep 06:
Technical Standards Regulations 2010-II: Boilers to meet minimum efficiency standards
Details
|
|
Sep 06:
Technical Standards Regulations 2010-III: Maximum heat rate of 2,280 kcal/kWh for coal plants
Details
|
|
Sep 06:
Technical Standards Regulations, 2010-VII: Electrical design parameters for electric lines
Details
|
|
Sep 06:
Technical Standards Regulations 2010-VI: Design parameters for sub-stations, switchyards
Details
|
|
Sep 06:
Technical Standards Regulations, 2010-V: Strict norms for IC-based TPS too
Details
|
|
Sep 06:
Technical Standards Regulations, 2010-IV: Recovery steam generators, turbines must for gas projects
Details
|
|
Sep 06:
Tariff for NCL's TPS-I expansion-I: Demand for Rs 40 crore towards spare rotor declined
Details
|
|
Sep 06:
Tariff for NCL's TPS-I expansion-II: Energy charges to climb every year
Details
|
|
Sep 05:
Transfer of surplus Sasan UMPP coal to Chitrangi: MoC's "stringent" condition has no teeth, claims Tata
Details
|
|
Sep 05:
Minister of Mines suggests strong measures for prevention of illegal mining of iron ore: Should the coal ministry take heed?
Details
|
|
Sep 05:
Does transfer of coal from SPV to allocatee constitute trade?-I MoC says no
Details
|
|
Sep 05:
Does transfer of coal from SPV to allocatee constitute trade?-II States not convinced about MoC's assertion
Details
|
|
Sep 05:
Pioneer ups Maharashtra CCPP capacity-III: MSECL offers to transmit part capacity
Details
|
|
Sep 05:
MCL to issue RoW for water pipeline of JSPL's 900 MW project in Orissa
Details
|
|
Sep 05:
No centre-owned projects in J&K? KCC&I demands transfer to state
Details
|
|
Sep 05:
Cooperative society demands coal blocks in Jharkhand
Details
|
|
Sep 05:
Land hurdles face Sasan Power's Moher and Moher Amlohri Extension coal blocks
Details
|
|
Sep 05:
Pioneer ups Maharashtra CCPP capacity-I: Seeks more gas
Details
|
|
Sep 05:
Pioneer ups Maharashtra CCPP capacity-II: Progress update
Details
|
|
Sep 05:
Pooling of gas prices-I: Mercados says issues can be sorted out with bid-based pooling
Details
|
|
Sep 05:
Pooling of gas prices-II: Price sensitivity of demand for gas justifies pooling mechanism, says Mercados
Details
|
|
Sep 05:
Pooling of gas prices-III: A backgrounder on Mercados' recommendations and the objections raised against them
Details
|
|
Sep 05:
Pooling of gas prices-IV: Other options suggested to enhance gas trading in India
Details
|
|
Sep 05:
Grid Standards Regulations, 2010-I: CEA makes frequency profile norms more stringent
Details
|
|
Sep 05:
Grid Standards Regulations, 2010-II: Categories of grid incidents, disturbances introduced
Details
|
|
Sep 05:
Grid Standards Regulations, 2010-III: Reporting norms institutionalized
Details
|
|
Sep 02:
Power projects in J&K-II: Lal Singh alleges conspiracy at Ujh TPP, as well
Details
|
|
Sep 02:
Power projects in J&K-I: MP accuses NHPC of incompetence, dishonesty
Details
|
|
Sep 02:
Supply of power equipment by BHEL-IV: Other decisions over review meeting
Details
|
|
Sep 02:
Principal Secretary weighs in on environmental clearance for coal blocks-III: MoC quick to initiate action
Details
|
|
Sep 02:
Simultaneous coal and CBM operations: DGH asks for re-drafting of co-development agreement, says present draft skewed towards coal ministry's interests
Details
|
|
Sep 02:
Principle secretary weighs-in on environmental clearance for coal mines-II: Pre-clearances before allocation?
Details
|
|
Sep 02:
Principal secretary weighs-in on environmental clearance for coal mines-I: Haseo-Arand coalfields not completely off limits
Details
|
|
Sep 02:
MoC to okay revised mining plan for Binani Cement's Nimbri Chandawatan lignite block
Details
|
|
Sep 02:
Pancheshwar multipurpose project-II: Uttarakhand demands rights on 50% of India's power share
Details
|
|
Sep 02:
Pancheshwar multipurpose project-I: MoEA asks Uttarakhand to not open can of worms with demand for HQ
Details
|
|
Sep 02:
BHEL's laxity, RoW issues hold up Tripura gas-based project
Details
|
|
Sep 02:
TICAPCO still holds out hope for South of Vellar lignite block
Details
|
|
Sep 02:
Supply of power equipment by BHEL-III: Is target setting a futile exercise?
Details
|
|
Sep 02:
Supply of power equipment by BHEL-I: Generic transport logistics to be evolved
Details
|
|
Sep 02:
Supply of power equipment by BHEL-II: Even penalty provisions fail to deter CWG projects from missing deadlines
Details
|
|
Sep 02:
Power Briefs
Details
|
|
Sep 02:
Gas Briefs
Details
|
|
Sep 01:
Hydropower development in Bhutan-II: Schedule of HEPs
Details
|
|
Sep 01:
Hydropower development in Bhutan-I: PC shortchanges Punatsangchhu-II, Mangdechhu HEPs
Details
|
|
Sep 01:
Fuel consumption by gas based TPPs: Details (July 2010)
Details
|
|
Sep 01:
Time and cost overruns at Teesta-V HEP-II: 13-month time overrun unavoidable
Details
|
|
Sep 01:
CEA releases monthly energy generation report for July 2010
Details
|
|
Sep 01:
End-use plants awaiting long-term coal linkage: Details
Details
|
|
Sep 01:
Time and cost overruns at Teesta-V HEP-I: MoP's committee approves revised cost estimate
Details
|
|
Sep 01:
Coal supply to Nalco's Angul CPP still critical
Details
|
|
Sep 01:
NALCO's Utkal-E coal mining venture to take-off soon
Details
|
|
Sep 01:
MoP seeks MoHIPE's intervention to power CWG 2010
Details
|